Software Development Life Cycles

Craig Skinner Inglês

Software Development Life Cycles

Conteúdo do mapa

Software Development Life Cycles

  1. Predicitive

    • Waterfall Models
      • Advantages
        • Very easy model to follow
        • Documentation is done throughout
        • Only producing 1 version of the product
        • Anyone can pick up and run with it at any stage
      • Disadvatages
        • If the initial requirements are misunderstood then the final product would be inccorect
        • Issues may not be found until final release to client
        • Difficult to expand or adapt the product
        • Dosen't account for any developments or changes to the initial requirements
      • Basic Principals
        • Based on sequential tasks that rely on previous tasks completed first
          • 1. Requirements: Meet with client, gain list of requirements and decide some deliverables
          • 2. System Design: Use the requirements from previous phase and design the system appropriately. GUIs, Wireframes, Relationship Diagrams Flowcharts.
          • 3.Implementation: Using the design documentation and build the end product, this could be in smaller sections which are then all brought together.
          • 4. Integration and Testing: Once all individual sections are designed, begin to bring all these elements together into 1 package and test the system internally
          • 5. Deployment: Post testing release the product to the client. All bugs should have been picked up in testing(In theory)
          • 6. Maintenance: Occurs post deployment. This could be improvements/additional functionality/repairs
        • Useful for small projects
        • Each stage must be signed off before moving on
    • Prototyping
      • Advantages
        • Ongoing client reviews and testing result in picking up issues early
        • Can allow for larger products to be delivered and tested out earlier, whilst next stage of the product is been developed.
        • Customer can see the development of the product
        • Accounts for changing requirements which can be discussed and built into the next version
        • The software is signed off at each stage, so at the end of the product the clients are more likely to approve
      • Disadvantages
        • Very time consuming
        • Requires a lot of customer input and evaluation.
        • Could lead to greater costs which where not initially agreed on
        • Gives the customer more flexibility, to change their minds
      • Basic Principals
        • Based on releasing versions of the end product with limited functions in each
        • The individual versions may not reflect the end GUI
        • Some versions may be written off
        • End goals can become clearer through each version
  2. Adaptive

    • Spiral
      • Basic Principals
        • Split into 4 main parts and a version is released to the client on each cycle.
        • Each version is a revision of the last after a review and testing phase.
        • Risks are identified early on and resolved before each version.
      • Advantages
        • Can account for changes to the customers requirements at each stage
        • Can give a good representation of progression for the client
        • Can be scaleable for larger projects
        • Allows for any issues to be picked up in early versions and rectified in the next
      • Disadvantages
        • Can become very complex as projects grow
        • Would likley lead to more work to do meaning higher overheads
        • Can be very time comsuming
        • Harder to manage
    • Agile
      • Basic Principals
        • The Agile model is based on the principal of taking a large project and dividing it up into smaller tasks.
        • Tasks are delegated between teams.
        • Teams each produce a small part of the program which is then added together to create a full version for client release.
        • After each release, developers will work on improving the product based on client feedback to launch a revised version
        • Each team has a focus and will carry out a sprint to get tasks complete and products turned around quickly
      • Advantages
        • Enables developers to turn software around very quickly
        • Lots of feedback and communication with client
        • Each team will specilise in area. This results in a higher quality end product
        • Any big changes can be made quickly
      • Disadvantages
        • Documentation is done by different people at various stages.
        • Requires a team of people
        • Each person needs to be specilised in their area.
        • Requires customers to review the entire product at each stage rather than small chunks.

Imagens e arquivos do mapa

  • Software Development Life Cycles
  • Software Development Life Cycles
  • Software Development Life Cycles

Informações

Descrição
Mapa Mental sobre Software Development Life Cycles, criado por Craig Skinner em 21-01-2019.