Mapa mental
topic 2
Conteúdo do mapa
topic 2
traffic control device
- Purpose is to convey message to road users
- objective
- To establish a user-friendly street and road system that is adequately and clearly understood by all users thereof.
- devices
- road marking
- on road surface to convey official information
- lines, pattern, words, symbols or reflector on the pavement, kerb, side of island or on fixed objects near the roadway
- Purpose is to control or regulate the traffic
- types
- pavement
- center lines
- lane line
- no passing zone
- turn marking
- stop lines
- kerb
- parking regulation
- pavement
- road sign
- types
- regulatory signs
- mandatory-speed limit
- prohibitory-no entry
- warning signs
- informatory signs
- regulatory signs
- characteristics
- shape
- color
- symbol
- types
- traffic island
- types
- divisional
- median along highways
- channelizing
- guide into proper channel
- reduce conflicts
- Establish desired angles of crossing and diverging
- Serve as convenient locations for other traffic control devices
- Refuge island for pedestrians
- Useful when the direction of flow is to changed
- guide into proper channel
- divisional
- types
- traffic signal
- to indicate, using a series of colors (Red - Amber - Green)
- types
- Fixed time controlled
- Vehicle actuated
- Linked/coordinated
- simultaneous
- single alternate
- double alternate
- flexible
- area
- road marking
Intersection Control Design
- signalized
- webster method
- objective & function
- To provide right–of–way to vehicles on each approach to increase traffic handling performance
- To provide efficient traffic movement and safety
- To reduce traffic conflict points, traffic delay
- advantage
- Provide for the progressive flow of a platoon of traffic along a given route
- Interrupt heavy traffic at intervals to allow pedestrians and cross-street traffic to cross or to enter the main street flow
- Increase the traffic-handling ability of a junction
- Reduce number of conflict point
- disadvantage
- improper design or unwarranted signal installations
- Excessive delay for motorists and pedestrians, particularly during off–peak periods
- Increased accident frequency
- Disregard of signal indications
- improper design or unwarranted signal installations
- warrant analysis
- 1) vehicle operations
- Total Volume (PCU): Traffic volume for each of any 8 hour of an average day meets the minimum requirements in Table 1
- peak hour volume
- urban/low speed roads
- rural/high speed roads
- progressive movements
- Total Volume (PCU): Traffic volume for each of any 8 hour of an average day meets the minimum requirements in Table 1
- 2) pedestrian safety
- Minimum traffic volume for each of any 8 hours of an average day exists
- Total traffic on major road ≥ 600 veh/h or where there is a raised median island 1.2 m or more in width, 1,000 or more veh/h
- 150 or more pedestrian/h crossing the road
- Minimum traffic volume for each of any 8 hours of an average day exists
- 3) accidents record
- 1) vehicle operations
- signalized
terminologies and definition
- Signal Aspect or Indications
- red
- STOP (DON’T GO)
- amber
- Drivers approaching the stop-line must slow down and ready to stop as the right-of-way is about to end
- Drivers who have already crossed the stop-line must proceed and clear the junction quickly
- green
- Proceed to follow the indicated direction
- red
- cycle time, Co
- phases
- all red period, R
- intergreen period
- I = a + R
- Signal Aspect or Indications
Elements To Consider In The Design Of A Traffic Signal Control System
- Selection of Traffic Phases
- minimum number of phases for any junction is = 2
- criteria
- traffic volumes
- traffic delays
- accident records
- geometry
- General Guideline For Provision Of Separate Right–turning Phases
- traffic volume
- traffic delay
- Accidents involving right–turning vehicles
- Saturation flow, S
- The maximum flow of vehicles passing the stop line during green period
- factor
- Percentage of right–turning traffic ( FR )
- Percentage of left–turning traffic ( FL )
- Turning radius ( FT )
- Gradient ( FG )
- correction
- Saturation flow for mixed movements lane
- Saturation flow for exclusive turning lane
- Optimum Cycle Time, Co
- timing setting
- Selection of Traffic Phases
Imagens e arquivos do mapa
Informações
- Descrição
- Mapa Mental sobre topic 2, criado por Ezrina Zakir em 24-07-2021.
- Criado por
- Ezrina Zakir
- Visualizações
- 2
- Avaliação