O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

Maintenance Approaches

Pedro Lumbreras Espanhol

Conteúdo do mapa

Maintenance Approaches

  1. Stage I

    • Hire or Train Personnel
      • In order to carry out the first maintenance actions, which are corrective in nature.
  2. Stage II

    • Type of Maintenance
      • Distinguish between corrective, modifying, preventive, and predictive maintenance.
  3. Stage III

    • Type of Tactic
      • TPM (Total Productive Maintenance) RCM (Reliability Centred Maintenance) MCC (Maintenance Control Centre) WCM (World Class Manufacturing) PMO (Preventive Maintenance Optimization) Reactive and Proactive
  4. Stage IV

    • Well Done
      • Is reached when companies adequately develop the previous levels. In this phase they are interested in measuring results and want to know how well they do their job.
  5. Stage V

    • Development
      • Characterized by seeking the development of skills and competencies in all its personnel, and they also deepen some of the previous stages.
  6. Stage VI

    • Knowledge
      • Defined as asset management, which allows integrating all the knowledge and best practices learned, with the In order to flexibly and successfully manage your assets

Informações

Descrição
Mapa Mental sobre Maintenance Approaches, criado por Pedro Lumbreras em 07-10-2021.
Criado por
Pedro Lumbreras
Visualizações
0
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?