O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

Geography Hard Engineering and Soft Engineering

Serena Norman Th Geography GCSE Espanhol 4,4Avaliação média 4,4 de 5 (5 avaliações)

Mind map of hard and soft engineering geography: dams, channel straightening and flood plain zoning

Mind map: Hard and soft engineering geography

Conteúdo do mapa

Geography Hard Engineering and Soft Engineering

  1. Dams and Reservoirs

    • Benefits
      • Reservoirs store water which reduces the risk of flooding.
      • The water in the reservoir is sued as drinking water and can be used to generate HEP.
    • Costs
      • Dams are very expensive to build.
      • Creating a reservoir can flood existing settlements.
      • Eroded material is deposited in the reservoir and not along the rivers natural course.
        • So farmland downstream can be less fertile.
  2. Channel Straightening

    • Benefits
      • Water moves out of the area quicker as it doesn't travel as far- reducing the risk of flooding.
    • Costs
      • Flooding may happen downstream of the straightened channel instead as flood water is carried there faster.
      • There is more erosion downstream as that is where the water is flooding fastest
  3. Soft Engineering - schemes set up using the knowledge of the river and its processes to reduce the effects of flooding

    • Flood Warnings
      • costs
        • Don't stop a flood from happening
        • Some people might not have access to the warnings
      • benefits
        • Impacts of flooding reduced
          • People have time to move possessions upstairs, put sandbags in position, evacuate, etc
    • Preparation
      • costs
        • Doesn't guarantee safety from a flood
        • Could give people a false sense of security.
        • Modifying homes and businesses is expensive.
      • benefits
        • Impact of flooding is reduced as buildings as buildings less damaged
        • People are less likely to worry about the threats of floods if they are preared.
    • Flood plain zoning
      • costs
      • benefits

Informações

Descrição
GCSE Geography (Water on the Land) Mapa Mental sobre Geography Hard Engineering and Soft Engineering, criado por Serena Norman Th em 28-03-2016.
Visualizações
285
Avaliação
Avaliação média 4,4 de 5 (5 avaliações)

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?