SAB11#48 Validate Scope

  • You need to gather all the stakeholders together and have them make sure that all the work really was done.
  1. Work performance data

  2. Project Management plan

  3. Deliverables

    • These are verified deliverables, which means they’ve been through Perform Quality Control.
  4. Traceability matrix

  5. Requirements documentation

  6. Verified deliverables

  7. Change requests

    • If they DON’T think that all the work was done, then you’ll need to make some changes. Back to change control!
  8. Project document updates

  9. Work performance information

  10. Group decision-making techniques

    • Once the stakeholders have inspected the deliverables, they’ll need to decide whether or not the deliverables can be accepted. Quality Assurance
    • Quality Assurance
      • In not made by the Proyect Manager. If there is not any QA the sponsor will take their place

Informações

Descrição
p Taller de Certificación de PMP Mapa Mental sobre SAB11#48 Validate Scope, criado por Omar Arce em 02-07-2016.
Criado por
Omar Arce
Visualizações
7
Avaliação

Mais sobre Validate Scope

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?