Perguntas do quiz (80)
1Which of the following statements describe the Monitor Work Center Schedules app?
There are 2 correct answers too this question.- AIt is a tool for dispatching, rescheduling, or deallocating individual bottleneck operations on pacemaker work centers in a graphical chart.
- BIt is a tool for dispatching, rescheduling, or deallocating several bottleneck operations on pacemaker work centers simultaneously in a graphical chart.
- CIt is a tool to analyze the schedule of operations in a graphical chart.
- DIt is a tool for dispatching, rescheduling, or deallocating operations not only on pacemaker works centers but on all work centers in a defined area of responsibility.
2What happens to dependent requirements of a planned order when you convert the planned order into a production order?
Please choose the correct answer.- AThey are converted into schedule lines.
- BThey are converted into reservations.
- CThey are converted into planned orders.
- DThey are converted into production orders.
3Which transactional data is required for predictive material and resource planning (pMRP)?
Please choose the correct answer.- APurchase orders
- BPlanned orders
- CPlanned independent requirements (PIRs)
- DSales orders
4How can you avoid order proposals for planned independent requirements with dates in the past?
There are 2 correct answers to this question.- AReorganize planned independent requirements
- BSet the requirements reduction indicator in the requirements class
- CMaintain adjustment parameter in the MRP group
- DUse a planning strategy with requirements consumption
5Which of the following statements are true for make-to-order production?
There are 2 correct answers to this question.- APlanned independent requirements always trigger final assembly.
- BSales orders are fulfilled by anonymous warehouse stock.
- CSales orders always trigger production.
- DPlanning assemblies can be combined with the Make-to-Order concept.
6What generates capacity requirements in a process order?
Please choose the correct answer.- AOperations
- BActivities
- CResources
- DPhases
7What are the properties of MRP Live?
There are 2 correct answers to this question.- AIt is executed on the database server
- BData is read sequentially from the database tables
- CThe code is written in SQL Script
- DIt uses the same BADIs as classic MRP
8Which statements are correct regarding BOMs?
There are 3 correct answers to this question.- APipeline materials can't be assigned as a stock item in the BOM.
- BBOM usage controls which material types for BOM headers are allowed.
- CIt's not possible to allocate group BOMs to individual plants.
- DYou can create a BOM that is applicable to all the plants by maintaining special character “*”
- EWhen you create the BOM for the first time, it will have a blank technical type.
9What are the prerequisites for using batch derivation?
There are 2 correct answers to this question.- ABatch determination selection conditions
- BProcess instructions
- CBatch where-used list
- DReceiver-sender relationships
10You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of the following order types consume the forecast?
There are 2 correct answers to this question.- ASales order
- BPlanned order
- CDependent demand
- DPurchase order
11A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)?
Please choose the correct answer.- AChange the explosion type of the phantom assembly in the BOM.
- BChange the item category of the phantom assembly in the BOM.
- CChange the special procurement key of the phantom assembly in the BOM.
- DChange the phantom item indicator for the phantom assembly in the BOM.
12Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.- AIn the MRP group
- BIn the material master
- CIn the plant parameters
- DIn the requirements class
13Which of the following are design principles of SAP Fiori?
There are 2 correct answers to this question.- AOn-premise
- BCoherent
- CComplex
- DDelightful
14A configurable material is a material for which different variants are possible. Identify all the planning strategies for configurable materials.
Please select all the correct answers that apply.- AMTO production for material variants (Strategy 26)
- BPlanning variants without final assembly (Strategy 55)
- CPlanning variants with a planning material (Strategy 65)
- DMTO production with configuration (Strategy 25)
15Production orders are used for what production type?
Please choose the correct answer.- AProcess manufacturing processes
- BReplenishment controlled by control cycles
- CPeriod and quantity-oriented production
- DDiscrete manufacturing processes
16Which SAP solutions can be used for forecasting in Supply Chain Planning?
There are 2 correct answers to this question.- AMaterial Requirements Planning (MRP)
- BSupply Chain Management (SCM)
- CCapacity Requirements Planning (CRP)
- DIntegrated Business Planning (IBP)
17A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days.
Starting from when are the 12 days counted backwards?
Please choose the correct answer.- AFrom the planned independent requirement date of the material
- BFrom the requested delivery date of the related finished good
- CFrom the availability date of the related finished good
- DFrom the dependent requirement date of the material
18At which level is scheduling performed?
Please choose the correct answer.- AMaterial
- BOrder
- CResource
- DProduction Data Structure
19Which of the following are pillars of the SAP Activate framework?
There are 2 correct answers to this question.- ASAP Best Practices
- BSAP industry cloud
- CExpert configuration
- DSAP Activate methodology
- ESAP Launch methodology
20Which of the following isn’t considered for overall duration of an operation?
Please choose the correct answer.- AWait time
- BProcessing time
- CQueue time
- DTeardown time
- ESetup time
21Where does the system check master data selection settings during the creation of planned orders and production orders?
There are 3 correct answers to this question.- AIn the production version
- BIn the production order type
- CIn the bill of materials (BOM)
- DIn the routing
- EIn the MRP controller
22What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.- AMaterial Coverage Fiori app
- BLock-free inventory movements
- CFlow manufacturing
- DMonitor Production Orders Fiori app
- ERough-cut capacity planning
23Which of the following is a valid sequence of the main activities in product on order processing?
Please choose the correct answer.- ACreation, scheduling, release, material withdrawal, confirmation
- BCreation, staging, release, material withdrawal, confirmation
- CCreation, scheduling, release, variance calculation, confirmation
- DCreation, release, scheduling, material withdrawal, confirmation
24Which of the following planning strategies are make-to-stock strategies?
There are 3 correct answers to this question.- APlanning without final assembly
- BPlanning with final assembly
- CPlanning at assembly level
- DProduction by lot size
25In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.- AProcess order
Control recipe
PI sheet
Process message - BProcess order
Control recipe
Process message
PI sheet - CControl recipe
Process order
PI sheet
Process message - DControl recipe
Process order
Process message
PI sheet
- AProcess order
26What can you use heuristics in Advanced planning (PP/DS) for?
Please choose the correct answer.- ATo automate material movements in material staging.
- BTo optimize costs and times in production plants.
- CTo solve planning problems for defined objects.
- DTo set default values in production master data.
27With reference to the material availability check, which of the following statements are correct?
There are 2 correct answers to this question.- AThe scope of check is determined for each component.
- BWhen there is a material shortage, the system sets the status MSPT (material shortage).
- CYou can check missing parts information by accessing Transaction COOIS.
- DThe material availability check is always performed automatically.
28Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability.
Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.- AThe ATP category for restricted-use stock
- BThe checking control for the order type
- CThe checking rule from the business application
- DThe checking group from the material master
29Which of the following apply to MRP Live?
There are 2 correct answers to this question.- AThe BAdIs for classical MRP also apply to MRP Live.
- BThe definition of the planning scope is more flexible.
- CPlanned orders need to be converted to purchase requisitions for externally procured materials.
- DThe sequence of planning materials is calculated across plants.
30What are options for printing production order data?
There are 2 correct answers to this question.- AReprint of a production order for a job ticket
- BPrint of a production order with system status CRTD
- COriginal print of previously printed operations of an order
- DMass print of orders in the background
31What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning?
There are 2 correct answers to this question.- AThe Change Planning Direct on indicator is set.
- BAlternative resources are fully occupied.
- CThe planning strategy is infinite.
- DThe work center has several individual capacities.
32When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.- ALow product stability
- BHigh product stability
- CLow product complexity
- DHigh product complexity
33Which statements are correct with reference to the Schedule Production app?
There are 3 correct answers to this question.- APlanning Mode can be selected flexibly between Bucket and Sequence.
- BYou can have more than one work center as a bottleneck work center.
- CThis app is applicable only for pacemaker or bottleneck work center.
- DOnly the Chart view is available for this app.
- EYou can perform dispatch, deallocate, and reschedule of operations.
34In the stock requirements list, planned orders created within the Preplanning segment have a special type VP. Which planning strategies are associated with this special planned order type VP?
Please select all the correct answers that apply.- APlanning with a planning material (Strategy 60)
- BPlanning without Final Assembly and without MTO (Strategy 52)
- CPlanning with a planning material and without MTO (Strategy 63)
- DPlanning without final assembly (Strategy 50)
35What does a line hierarchy in repetitive manufacturing represent?
Please choose the correct answer.- AA production line with a parallel sequence in the routing
- BA production line with an alternative sequence in the routing
- CA production line with more than one work center
- DA production line with prioritized alternative work centers
36Which of the following statements are true for make-to-stock production?
There are 3 correct answers to this question.- APlanning assemblies can be combined with the make-to-stock concept.
- BSales orders are fulfilled by anonymous warehouse stock.
- CSales orders always trigger production.
- DPlanned independent requirements always trigger assembly.
37A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent?
Please choose the correct answer.- ACapacity category
- BWork center category
- CNumber of individual capacities
- DAvailable capacity version
38Which time elements are relevant for lead time scheduling of a production order?
There are 2 correct answers to this question.- APlanned delivery time
- BSetup time
- CTotal replenishment lead time
- DFloat after production
39The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.- AExact lot sizing
- BMinimum lot sizing
- CPeriodic lot sizing
- DFixed lot sizing
40Which of the following are forecasting tools in SAP Supply Chain Management?
There are 2 correct answers to this question.- AStandard SOP
- BDemand Management
- CCapacity Planning
- DFlexible Planning
41Which statements are correct for an MRP Live planning run?
Please choose the correct answer.- AUnlike a classic MRP run, an MRP Live run won't store the information related to planned materials and messages.
- BWith simplifications to SAP S/4HANA, in a regenerative planning run, MRP plans only the materials that have undergone planning-relevant changes.
- CMRP Live executes net change planning when regenerative planning option isn't selected.
- DStock net-off across plants is one of the benefits of an MRP Live run.
42What information is included in the SAP Readiness Check result for SAP S/4HANA?
There are 3 correct answers to this question.- AInconsistent data tables
- BCustom code analysis
- CRecommended SAP Best Practices
- DRelevant simplification items
- ERecommended SAP Fiori apps
43In the Schedule Production app, which settings can you make in the planning strategy?
There are 3 correct answers to this question.- AFixed pegging (on/off)
- BFiniteness level (0...1)
- CDirection (forward/backward)
- DPlanning mode (bucket/sequence)
- EScheduling control (finite/infinite)
44At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated?
Please choose the correct answer.- AThe requirements date occurs before that of a firmed planned receipt
- BThe requirements date occurs that of a firmed planned receipt
- CA firmed planned receipt cannot be rescheduled
- DThe requirement no longer exists
45Which of the following settings are contained in a product heuristic?
There are 3 correct answers to this question.- AAvailable-to-promise
- BScheduling strategy
- CNet requirements
- DLot-sizing
46Why would you use phantom assemblies?
There are 3 correct answers to this question.- ATo increase the number of planning levels
- BTo reduce the number of changes required in bills of materials
- CTo reduce the number of material masters
- DTo make the assignment of components easier
- ETo simplify the structure of bills of materials
47How does new Inventory Management Data model contribute to the reduction of the data footpint?
There are 3 correct answers to this question.- ABy eliminating hybrid tables
- BBy eliminating inventory history tables
- CBy eliminating material master tables
- DBy eliminating inventory tables
- EBy eliminating fields for different stock types
48In net requirements planning of the MRP, which of the following are seen as requirements?
There are 2 correct answers to this question.- AStock
- BSales orders
- CFixed receipts
- DSafety stock
49Your client uses process orders for the production of liquid chemicals. What can you define to ensure that the flow happens only in physically connected tanks?
Please choose the correct answer.- AOperation network
- BResource network
- CWork center hierarchy
- DSetup matrix
50Which of the following statements describe the Schedule Production app?
There are 2 correct answers to this question.- AIt is a straightforward tool for the capacity leveling of planned, production and process orders.
- BIt is specially designed for dispatching orders to pacemaker or bottleneck work centers.
- CIt records sales orders to ensure all demands are at the same level of fulfillment.
- DIt maintains capacity and raw material constraints to achieve right product mix.
51Where can you find the latest in version of the Simplification List for SAP S/4HANA?
Please choose the correct answer.- ASAP Support Portal
- BSAP Solution Manager 7.2
- CSAP Help Portal
- DSAP Best Practices Explorer
52In which of the following can you find the main items and tasks of PP/DS planning?
There are 2 correct answers to this question.- ACross-location, period-based planning
- BLocation-related capacity planning
- CLocation-related material requirements planning
- DDemand forecasting
53Which chart types does the tabular planning table provide in SAP S/4HANA?
There are 2 correct answers to this question.- AOrder (pool) chart
- BWork center capacities chart
- CCapacity requirements chart
- DOrders (dispatched) chart
54What are the options for transferring data to SAP S/4HANA with the SAP S/4HANA Migration Cockpit?
There are 2 correct answers to this question.- AXML files
- BCSV files
- CTemporary tables
- DStaging tables
55What facts document the strengths of SAP S/4HANA?
There are 3 correct answers to this question.- A7x higher data throughput
- B4x less process steps
- C10x higher data footprint
- D1800x faster analytics and reporting
56To execute the subcontracting process in PP-DS, what must be set up in SAP S/4HANA?
There are 2 correct answers to this question.- ARoutings
- BStorage locations as MRP areas
- CSubcontracting MRP areas
- DProduct versions
57What data can you maintain in the sub items of a bill of material (BOM)?
There are 2 correct answers to this question.- AInstallation point
- BQuantity
- CItem type
- DScrap percentage
58Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.- AConcur
- BSAP Visual Enterprise
- CSAP Hybris
- DSAP Human Capital Management
- ESAP Fieldglass
59Which business processes are affected by settings in the order type-dependent parameters?
There are 3 correct answers to this question.- AImplement engineering changes.
- BDefine integration to cost accounting.
- CSelect master data.
- DInitiate quality inspections.
60Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.- AMove time
- BTear down time
- CProcessing time
- DQueue time
61Which of the following time elements does MRP use during backward scheduling for in-house production?
There are 2 correct answers to this question.- APlanning time fence
- BPlanned delivery time
- COpening period
- DGoods receipt processing time
62What is the difference between the earliest dates and latest dates of an operation?\
Please choose the correct answer.- AQueue time
- BSetup time
- CWait time
- DProcessing time
- ETeardown time
63A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Please choose the correct answer.- AFinite resource and finite strategy
- BInfinite resource and infinite strategy
- CInfinite resource and finite strategy
- DFinite resource and infinite strategy
64Which indicator in the material master record determines whether a component is procured for a specific sales order stock?
Please choose the correct answer.- AAvailability check of the finished product
- BMRP type of components
- CIndividual/coll. requirement of the component
- DMixed MRP indicator of the finished product
65What is the function of Usage in the routing header details?
Please choose the correct answer.- AThe key specifies the areas in which the task list can be used.
- BYou use this indicator to specify that the task list will be deleted with a deletion program.
- CThe usage describes the task list types used in PRT or work centers.
- DThe usage key identifies the processing status of a task list.
66During planned order conversion to production order, an error occurred. What are the possible reasons?
Please choose the correct answer.- AThe planned order is fixed in the DS board.
- BThe Advanced Planning view isn't maintained for the material.
- CThe Work Scheduling view isn't maintained for the material.
- DThe planned order is already converted to the production order.
67You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible.
Which settings do you make to achieve this?
Please choose the correct answer.- APlanning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- BPlanning strategy 50 (Planning without final assembly) and the corresponding individual Collective indicator
- CPlanning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- DPlanning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
68What are pillars of SAP Activate?
There are 2 correct answers to this question.- AGuided Configuration
- BSAP MaxAttention
- CSAP Best Practices
- DPremium engagement
69Under what circumstances can you change the material type if stocks, reservations, or purchasing documents exist?
There are 2 correct answers to this question.- AThe same base unit of measurement is used
- BThe quantity and values updates are the same
- CThe same account category is used
- DThe same batch management level is used
70What are new feature of SAP S/4HANA with regard to MRP?
There are 2 correct answers to this question.- AFinite MRP planning by default
- BConsumption mode “Consumption in own period”
- CAutomated MRP run
- DMRP live
71Which of the following elements does MRP take into account during net requirement calculation?
There are 2 correct answers to this question.- AMaximum stock level
- BPurchase orders
- CLot size
- DSafety stock
72Which of the following statements are true regarding the material master?
There are 2 correct answers to this question.- AMaintaining the material master is a collective responsibility of different departments in an organization.
- BThe material type determines the screen sequence, material number assignment, and procurement type.
- CIt’s always possible to change the industry sector of a material after you assign it.
- DIt’s possible to set the industry sector as default but not possible to set views and organization levels as default.
73Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?
There are 2 correct answers to this question.- AThe maximum mater all number length is 40 for external numbers and 18 for internal numbers
- BIn Customizing you can decide by material type whether to use the long material number.
- CThe display template for material numbers applies to all clients.
- DThe number of leading zeros for internal numbers is client-specific.
74When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.- APosting of production costs to cost collector
- BReduction of the capacity requirements
- CStaging of components for the next order in the sequence
- DArchiving of backflush documents
75Which statements are correct with reference to BOMs?
There are 2 correct answers to this question.- AThe BOM status shows which application areas the BOM can be used in.
- BPhantom assemblies will have the technical type P.
- CNet ID should be checked if the component is the same as the higher-level assembly.
- DThe system will assign a low-level code for each material in the BOM structure.
76Which settings do we find in a detailed scheduling strategy?
There are 2 correct answers to this question.- ALot-sizing procedure
- BPlanning in nonworking times
- CPlanning direction, starting from the desired date
- DWhether a planned order or purchase requisition is created
77Which material master view is mandatory to enable discrete manufacturing?
Please choose the correct answer.- AAdvanced Planning view
- BAccounting 1 view
- CWork Scheduling view
- DMRP 4 view
78You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.- ACapacity requirements determination
- BMaster data selection
- CPlanning selection
- DActual cost calculation
- EOrder type determination
79When you define the process instruction category, you have to assign a process instruction type to enable the system to process the data accordingly.
What are the different process instruction types available?
There are 3 correct answers to this question.- AProcess groups
- BUniversal
- CCalculations
- DDynamic function calls
80Which statements are correct for phantom assemblies?
There are 3 correct answers to this question.- APhantom assemblies are used to group components together.
- BPhantom assemblies are planning relevant.
- CSpecial procurement key 50 is used to define a material as a phantom assembly.
- DPhantom assemblies behavior can't be overwritten in the BOM.
- EComponents in the phantom assemblies are aligned to the superior assembly.
Informações
- Descrição