  1. 1Which of the following statements describe the Monitor Work Center Schedules app?
    There are 2 correct answers too this question.
    1. AIt is a tool for dispatching, rescheduling, or deallocating individual bottleneck operations on pacemaker work centers in a graphical chart.
    2. BIt is a tool for dispatching, rescheduling, or deallocating several bottleneck operations on pacemaker work centers simultaneously in a graphical chart.
    3. CIt is a tool to analyze the schedule of operations in a graphical chart.
    4. DIt is a tool for dispatching, rescheduling, or deallocating operations not only on pacemaker works centers but on all work centers in a defined area of responsibility.
  2. 2What happens to dependent requirements of a planned order when you convert the planned order into a production order?
    Please choose the correct answer.
    1. AThey are converted into schedule lines.
    2. BThey are converted into reservations.
    3. CThey are converted into planned orders.
    4. DThey are converted into production orders.
  3. 3Which transactional data is required for predictive material and resource planning (pMRP)?
    Please choose the correct answer.
    1. APurchase orders
    2. BPlanned orders
    3. CPlanned independent requirements (PIRs)
    4. DSales orders
  4. 4How can you avoid order proposals for planned independent requirements with dates in the past?
    There are 2 correct answers to this question.
    1. AReorganize planned independent requirements
    2. BSet the requirements reduction indicator in the requirements class
    3. CMaintain adjustment parameter in the MRP group
    4. DUse a planning strategy with requirements consumption
  5. 5Which of the following statements are true for make-to-order production?
    There are 2 correct answers to this question.
    1. APlanned independent requirements always trigger final assembly.
    2. BSales orders are fulfilled by anonymous warehouse stock.
    3. CSales orders always trigger production.
    4. DPlanning assemblies can be combined with the Make-to-Order concept.
  6. 6What generates capacity requirements in a process order?
    Please choose the correct answer.
    1. AOperations
    2. BActivities
    3. CResources
    4. DPhases
  7. 7What are the properties of MRP Live?
    There are 2 correct answers to this question.
    1. AIt is executed on the database server
    2. BData is read sequentially from the database tables
    3. CThe code is written in SQL Script
    4. DIt uses the same BADIs as classic MRP
  8. 8Which statements are correct regarding BOMs?
    There are 3 correct answers to this question.
    1. APipeline materials can't be assigned as a stock item in the BOM.
    2. BBOM usage controls which material types for BOM headers are allowed.
    3. CIt's not possible to allocate group BOMs to individual plants.
    4. DYou can create a BOM that is applicable to all the plants by maintaining special character “*”
    5. EWhen you create the BOM for the first time, it will have a blank technical type.
  9. 9What are the prerequisites for using batch derivation?
    There are 2 correct answers to this question.
    1. ABatch determination selection conditions
    2. BProcess instructions
    3. CBatch where-used list
    4. DReceiver-sender relationships
  10. 10You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of the following order types consume the forecast?
    There are 2 correct answers to this question.
    1. ASales order
    2. BPlanned order
    3. CDependent demand
    4. DPurchase order

Information

Description
Quiz on Test 3, created by Rémi ILLES on 30/04/2024.
Language
English
Views
0
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?