O GoConqr está de visual novo! Conte para nós o que você achou.

Quiz

TEST 7

Ángel Gabriel Martínez García 10 perguntas

Fazer o quiz

Perguntas do quiz (10)

  1. 1For which of the following transactions do you receive an error message if the automatic account determination is set up incorrectly? Note: There are 3 correct answers to this question.
    1. AMaterial price change
    2. BPurchasing info record price change
    3. CStock transfer posting between stock types
    4. DGoods receipt into blocked stock
    5. EStock transfer between company codes
  2. 2You use quota arrangements. You include a new supplier in an existing quota system. How can you ensure that the new supplier is considered as if they had been part of the quota arrangement from the beginning?
    1. AManually update the quota
    2. BManually update the quota-allocated quantity
    3. CManually update the source list
    4. DManually update the quota base quantity
  3. 3What are some of the prerequisites to use a stock determination strategy for a material in management? Note: There are 3 correct answers to this question
    1. AAssign a stock determination group in the material master record
    2. BAssign a stock determination rule to the business transaction in Customizing
    3. CAssign a stock determination strategy to the material type in Customizing
    4. DCustomize a stock determination rule and assign it to the storage type
    5. ECustomize a cross-application strategy for stock determination
  4. 4In the standard system, a controllable system message is shown when a user creates a purchase order with a delivery date in the past. What must you configure to allow such purchase orders to only be created by authorized users?
    1. ACopy the system message to a new version.
    2. BCopy the system message to a new version. Set it as an error message. Assign the version with user parameter MSV to non-authorized users.
    3. CCopy the system message to a new version. Set it as an error message. Assign the version with user parameter MSV to the authorized users.
  5. 5How can you automatically update the conditions in an already created purchasing info record?
    1. ASelect the Info Update indicator when creating a purchase order
    2. BSelect the Info Update indicator when creating a contract release order
    3. CSelect the Info Update indicator when maintaining a quotation
    4. DSelect the Info Update indicator when maintaining a contract
  6. 6When creating an invoice with purchase order reference, which options are available for the automatic posting of unplanned delivery costs? Note: There are 2 correct answers to this question.
    1. AThe costs can be distributed among the invoice items.
    2. BThe system determines a freight clearing account for posting the costs.
    3. CThe costs can be posted to a separate account.
    4. DThe costs are posted automatically in a separate invoice .
  7. 7You send newly created purchase orders to a supplier via EDI,whereas quantity or price changes are transmitted by e-mail. What prerequisites must be met if you are using the condition technique for message determination? Note: There are 3 correct answers to this question.
    1. AYou have configured different message types for the New and Change print options
    2. BThe New Message Determination Process for Change Messages indicator is flagged in Customizing.
    3. CThe condition record contains the Price and Quantity fields.
    4. DThe Price and Quantity fields are relevant for printout changes.
    5. EThe dispatch time related to the change message needs to be set to 1 (send with periodically m scheduled job).
  8. 8Where can you enter a rounding profile? Note: There are 2 correct answers to this question.
    1. ASource list
    2. BLot-sizing procedure
    3. CPurchasing info record
    4. DMaterial master
  9. 9What data does the system require to determine the safety stock during automatic reorder point planning? Note: There are 3 correct answers to this question.
    1. AService level
    2. BThe storage costs code
    3. CMean absolute deviation
    4. DMinimum and maximum stock levels
    5. EReplenishment lead time
  10. 10Production planning and product costing are to be implemented in your company. Which organizational level must you choose for stock valuation?
    1. AControlling area
    2. BBusiness area
    3. CPlant
    4. DCompany code

Informações

Descrição
SAP Quiz sobre TEST 7, criado por Ángel Gabriel Martínez García em 19-09-2024.
Idioma
Español
Visualizações
0
Etiquetas
sap
Avaliação
Ainda sem avaliações
Avalie este quiz
Avalie este quiz

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?