Ajude a dar forma ao GoConqr. O que a gente deve adicionar?

Quiz

4.15 Plant Maintenance and Administration

TRAVIS CANNING 10 perguntas

Fazer o quiz

Perguntas do quiz (10)

  1. 1Written communication includes:
    1. Letters
    2. Memos
    3. Posters
    4. Procedure manuals
    5. Charts
    1. A1,2,3,4,5
    2. B1,2,4
    3. C2,3,4
    4. D1,3,5
    5. E2,4,5
  2. 2Parts inventory control falls under which classification of preventative maintenance:
    1. AActual work
    2. BPaper work
    3. CTemporary work
    4. DMechanical work
    5. EPre-work
  3. 3Areas of maintenance that must be scheduled can be located by:
    1. Foreman or shift supervisor inspections
    2. Regular observation by the operators
    3. Government inspections
    4. Insurance inspections
    1. A1,2,3,4
    2. B1,2,3
    3. C1,3,4
    4. D1,2
    5. E3,4
  4. 4As part of the environmental management program it is important for the company to keep in touch with the public by:
    1. Brochures and info about future plans
    2. Emergency phone numbers in case they have a concern with operation of the facility
    3. Provide them with an emergency evacuation plan
    1. A1
    2. B2
    3. C3
    4. D1,2
    5. E1,2,3
  5. 5Records are kept in a steam plant for which of the following reasons:
    1. Legal requirements
    2. Supervisory requirements
    3. Analysis and decision making requirements
    4. Financial requirements
    1. A1,2
    2. B1,3,4
    3. C2,3,4
    4. D1,2,3,4
    5. E1,2,3
  6. 6The purpose for a project review is to:
    1. Gain experience
    2. Recommend changes for the next time
    3. Inform other people of various problems
    4. Make a report as part of the continuous planning program
    1. A1,2
    2. B2,3
    3. C1,3,4
    4. D2,3,4
    5. E1,2,3,4
  7. 7Which of the following are the two broad classifications of preventative maintenance?
    1. Actual work
    2. Paper work
    3. Mechanical work
    4. Temporary work
    1. A1,2
    2. B3,4
    3. C2,3
    4. D1,4
    5. E2,4
  8. 8Plants suspected of wear within a pump should be ordered:
    1. AAnd in stock within your plant before the pump is dismantled
    2. BFrom the manufacturer having the manufacturer hold them in his stock as they may not be required
    3. COnly after the pump is dismantled and the parts inspected
    4. DBe ignored until they break down
    5. EBe removed immediately
  9. 9Information that might be on an equipment record card includes
    1. equipment repair history
    2. model type
    3. associated costs
    4. requisition number
    1. A1,2
    2. B2,3
    3. C1,2,3,4
    4. D2,3,4
    5. E3,4
  10. 10Visual communication includes
    1. Overheads
    2. Memos
    3. Posters
    4. Procedure manuals
    5. Charts
    1. A1,2,3,4,5
    2. B2,3,4
    3. C1,3,5
    4. D1,2,5
    5. E2,4,5

Informações

Descrição
Quiz sobre 4.15 Plant Maintenance and Administration, criado por TRAVIS CANNING em 01-03-2016.
Idioma
English
Visualizações
2
Avaliação
Ainda sem avaliações
Avalie este quiz
Avalie este quiz

Mais sobre Maintenance Management and Performance

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?