1 Define a road or road reserve based on Auckland Transport definition.
- AThe road, or road reserve, is defined as the area from the property boundary on one side of the road to the property boundary on the other side of the road. This includes the berm (grass verge), footpath and carriageway
- Bthe road is defined as the area from the boundary of the property on one side, the grass, footpath, berm, kerb and drain, carraigeway, other kerb and drain, berm, footpath and grass up to the property bounday
2What is an arterial route?
- AA road that mainly carries through traffic from one region to another
- Bforms principal avenues of communication for traffic movements
- CEncourage roadside development and access that is compatible with the arterial function (i.e not residential more semi-commercial)
- DAccess should be prioritized versus access function
3What is a motorway/ freeway?
- AMajor regional and inter-regional movement High speed Efficient and safe movement of vehicles
- Busing ramps, variable sign messages, speed controls, lane management and travel time estimation
4What is a collector/distributor road
- ACollects and distribute traffic, incl buses, within residential, commercial and industrial areas. -
- BProvide a link for local streets to main arterials. - Need to manage residential pressures to reduce speed overriding the need for traffic movement functions
5What are local roads?
- AProvide vehicle access to developments and residential properties Access for emergency and service vehicles
- BPedestrian and cyclist movements Neighbourhood social interactions Aesthetic values to the neighbourhood Speed is to be kept low i.e. 50km hr-1 or less
6Name 7 factors you would consider when making a new highway alignment?
- AKeep grades and curvature to the minimum necessary to satisfy the service requirements of the highway.
- BNever have two roads intersecting near a bend or at the top or bottom of a hill
- C Always provide adequate sight distance and avoid sudden changes in sight distance, especially near intersections.
- DAvoid areas or objects of historical, recreational or cultural significance.
- EAvoid having a sharp horizontal curve on or adjacent to a pronounced vertical curve.
- FLocate the highway wherever possible along property boundaries not through the middle of blocks of land particularly in farming areas.
- G Where it is practical maximise use of existing highway alignment to reduce land purchase costs.
- HAll of the above
7There are two flexible pavement design methods currently being used. Name them and state the difference between the two.
- AEmpirical: Based on experiments and experience, can be simple or complex, charts etc.
- B Mechanistic-Empirical: Using stresses, strain and deflections caused by loading and material properties on the pavement structure.
8TNZ F/I: 1997 specification for earthworks construction. Clause 9 refers to Excavation and 9.6 is excavation of ‘Benching’. Discuss two things that must be done on site when ‘Benching’.
- A9.6.1 Any portion of the ground whose slope is steeper than three horizontal to one (1V/3H) vertical shall be benched before filling is placed on it, unless otherwise directed by the Engineer.
- B9.6.2 Each bench shall be constructed to a width adequate to permit suitable construction equipment to operate on it. The base of the benches shall be sloped inwards at a slope of 12 horizontal to 1 vertical (1V/12H). The longitudinal profile of each bench shall be graded to ensure adequate drainage and safe discharge of water.
- A9.6.1 Any portion of the ground whose slope is steeper than three horizontal to one (1V/3H) vertical shall be benched before filling is placed on it, unless otherwise directed by the Engineer.
9Earthworks Terminology. Explain what the following terminologies as described in TNZ F/1. "Borrow" "Overbreak" "Surface Water Channel"
- A"Borrow" is excavation from outside the construction batter limits shown on the drawings.
- B"Overbreak" is the excavated material removed by the Contractor's operations from outside the construction cut batter limits shown on the drawings, but not authorised as borrow.
- C"Surface Water Channel" is a water channel formed at the subgrade surface at the edge of the road. (1 mark each)
10(d) Type A, R1 and R2 are classification of materials in TNZ F1. Briefly describe each of them.
- AType A Material is all material which does not fall within categories R1, R2, W, or U.
- BType R2 Material This is rock which cannot be productively ripped unless equipment is used which is more powerful than a crawler tractor having net engine (or flywheel) power in the range 270310 kW and fitted with a single shanked hydraulic ripper. If a tractor meeting the above specification is not readily available then, a 30 tonne hydraulic excavator with a single ripper on the boom may be used to determine R2 materials, providing the performance of the hydraulic excavator has been compared with a crawler tractor in similar materials.
- CType R1 Material This is rock which cannot be productively ripped unless equipment is used which is more powerful than a crawler tractor having net engine (or flywheel) power in the range 100115 kW and fitted with a twin shanked hydraulic ripper. If a tractor meeting the above specification is not readily available then, a 30 tonne hydraulic excavator using a bucket may be used to determine R1 materials. Alternatively, a smaller excavator with a single tyne ripper may be used providing its performance has been compared with a crawler tractor in similar materials.
11Describe what chipseal is (wearing course) in a flexible pavement and include what 1st, 2nd coat seals are.
- AChip encased in binder
- BFirst coat seals Grade 4 chip lower viscosity bitumen
- C Second coat seals– Grade 2 or 3 chip with180/200 bitumen
12Describe the following three desirable M4 aggregate properties.
- AStrength and Hardness Aggregate shape Durability or Soundness
Strength & Hardness The aggregates at top layers - Stress action due to traffic wheel load, - Wear and tear, - Crushing. Aggregates should possess high resistance to crushing, and withstand the stresses due to traffic wheel load. The surface aggregates are subjected to constant rubbing or abrasion due to moving traffic especially steel tyred vehicles. Should be hard enough to resist the abrasive action caused by the movements of traffic. - BShape of aggregates Aggregates which happen to fall in a particular size range may have rounded, cubical, angular, flaky or elongated particles. Flaky and elongated particles have less strength and durability when compared with cubical, angular or rounded particles of the same aggregate. Avoid too flaky and too much elongated aggregates.
- CDurability The property of aggregates to withstand adverse action of weather is called soundness. Aggregates are subjected to the physical and chemical action of rain and bottom water, impurities there-in and that of atmosphere. It is desirable that the road aggregates used in the construction should be sound enough to withstand the weathering action
- AStrength and Hardness Aggregate shape Durability or Soundness
13TNZ M4 Tests. State the values to be achieved whilst carrying out the following tests during aggregate production.
Sand Equivalent – value? Clay Index – value and sieve size? Plasticity Index – value and sieve size?- AThe sand equivalent shall not be less than 40 when the aggregate is tested according to NZS 4407: 1991, Test 3.6 Sand Equivalent Test. (1 mark)
- BThe clay index of the fraction of basecourse passing the 75μm sieve shall not be greater than 3 when the aggregate is tested according to NZS 4407: 1991, Test 3.5 Clay Index Test.
- CThe plasticity index of the fraction of basecourse passing the 425μm sieve shall not be greater than 5 when the aggregate is tested according to NZS 4407: 1991, Test 3.4 Plasticity Index Test.
- AThe sand equivalent shall not be less than 40 when the aggregate is tested according to NZS 4407: 1991, Test 3.6 Sand Equivalent Test. (1 mark)
14(c Describe the term ‘well graded’ in reference to particle size distribution. Illustrate using a graph.
‘Well graded’ material – great interlocking property. Good for compaction etc. Graph is acceptable.- AVerdadeiro
- BFalso
15 Describe what Bitumen is.
- ABitumen is black, pitch-like materials obtained from refining crude petroleum which originated as organic deposits in the earth’s crust.
- BIn the US bitumen is referred to as asphalt and occasionally as asphaltic bitumen or asphaltic cement.
- ABitumen is black, pitch-like materials obtained from refining crude petroleum which originated as organic deposits in the earth’s crust.
16What are the constituents of bitumen emulsion? A bitumen combined with water using an emulsifier
- AVerdadeiro
- BFalso
17What is the difference between “fluxing” and “cutting back” of a binder?
- AFluxing the permanent reduction in the viscosity of a cut back bitumen, normally using AGO
- BCutting back is the temporary reduction in the viscosity of cut back bitumen, normally using kerosene
- CAll of the above
18Draw an illustration of a Flexible Pavement. State 2 advantages. ii. Describe Rigid Pavements. State 2 advantages. iii. State 2 specific advantages that would favour Rigid over Flexible Pavements when dealing with inferior subgrade CBR values.
2 marks each for descriptions – multilayer design & flexibility, bituminous surfacing, concrete & rigid design 2 marks for Rigid Pavement advantages.- AVerdadeiro
- BFalso
19(a) Describe what Polymer Modified Bitumen is. When using rubber or polymer modified bitumen, state 3 objectives for using such additives. (5 Marks)
- APolymer Modified Bitumen (PMB) This is a penetration grade binder with an addition of a polymeric substance , often latex , to give greater flexibility and ductility particularly at lower road surface temperatures.
- BRubber and Polymer-modified Binders Scrap rubber, new rubber and polymer additives in various forms may be used in sprayed sealed work to modify bituminous binders in order to (i) improve aggregate retention, (ii) reduce the temperature susceptibility of the binder, and (iii) alleviate or reduce reflection cracking. (2 marks for PMB and 3 for the objectives)
20When designing roads, there are Design Parameters that needs to be considered during this process such as the Classification of the road. Name four other parameters to be accounted for.
- ATraffic Volumes and Composition
- BDesign Speed
- C Design Vehicle
- D Environment
- EAccess – safe , efficient
- F Drainage – runoff disposal, flooding • Utility services
- Gall of the above
21State what the term “Semi-rigid pavement” means. With aid of a sketch, illustrate and label the different layers. Also state why would this type of pavement be used versus the conventional methods?
1 mark for describing semi rigid, 1 mark for the reason to use SR pavement and 4 marks for the diagram with labels
Reason is soft subgrade material.- AVerdadeiro
- BFalso
22With an aid of a sketch, highlight 3 differences each between an Urban and a Rural road design.
Sketch both and highlight: K&C, Table drain, Feather edges, Berm, Footpaths, Shoulders, Under-channel drains (K&C). (1/2 mark for each)- AVerdadeiro
- BFalso
Informações
- Descrição
- Diploma Highway Engineering 1 Quiz sobre highway engineering 1 test, criado por Pauline Leota em 13-05-2015.
- Autor
- Pauline Leota
- Idioma
- English
- Visualizações
- 7
- Etiquetas
- Avaliação
- Ainda sem avaliações Avalie este quiz