GoConqr has a new look! Let us know what you think.

Quiz

LSSBB5

Brandis Thornton 200 questions

Take the quiz

Questions in this quiz (200)

  1. 1Two machines are to be compared. A sample of 100 pieces of manufactured product is taken from each machine and their measurements recorded each day of the week. Which control chart is the most appropriate to compare the results from the two machines over time?
    1. AI chart
    2. BXbar and r chart
    3. CMR chart
    4. DXbar and S chart
  2. 2You have been observing an operation for several days and have collected a long list of incidents regarding production stoppages and downtime due to equipment failures. Which of the following provides the best strategy going forward?
    1. ATPM
    2. B5S
    3. CContinuous flow manufacturing
    4. DPoka-yoke
  3. 3Which of the following losses are related to the performance efficiency measure in the OEE index?
    1. AIdling, stoppages, reduced speed
    2. BSetup, running, cleanup
    3. CIdling, stoppages, increased speed
    4. DWaiting, running, setup
  4. 4An engineering organization is frustrated with the length of time it takes to push through engineering changes. The quality of the changes has never been an issue. What approach would you recommend for improvement?
    1. AUse Pareto analysis to understand major barriers in the process; Perform an FMEA to identify and prioritize process failures; Experiment to sort out which process failures have the greatest impact; Redesign and implement a new engineering change process.
    2. BUse control charts to establish a baseline for the length of time it takes to push through engineering changes and characterize the problem; value stream map the process to identify bottlenecks and areas of waste; experiment with a new, streamline process; implement a control plan to ensure the new process is sustained.
    3. CAssess the knowledge and skill levels of everyone; provide remedial training to close any knowledge/skill gaps; reassess to make sure the procedure is being followed correctly.
    4. DClear the backlog of engineering changes with temporary engineers; use control charts to measure the process cycle times; provide incentives to expedite the process; identify bottlenecks and add incremental staff to sustain throughput.
  5. 5A company has undergone a series of process improvement projects. After re-analysis of the measurement system, the company found the part-to-part variation to be 60% and the gage R&R to be 35%. Which statement is true?
    1. AThe part-to-part variation is unacceptable.
    2. BBoth the measurement system and the part-to-part variation are unacceptable.
    3. CThe measurement system is not acceptable.
    4. DThe measurement system is acceptable.
  6. 6In the purification of pharmaceutical manufacturing, the conductivity of the chemicals used was found to have a big influence on the final yield. The chemicals are prepared manually by engineers using a mixed and heater. What does the technical team need to do for the yield to increase so that the process is under control?
    1. AHave a control plan that has a control chart for yield.
    2. BHave a control plan so that engineers are controlled to give a consistent mixing and heating temperature while preparing chemicals for the purification step.
    3. CHave a control plan for some of the inputs of the process and process conditions.
    4. DIdentify the inputs that impact the process yield and have control limits for all the inputs within a specification limit.
  7. 7During which DMAIC phase does knowledge management become most critical?
    1. AMeasure
    2. BControl
    3. CAnalyze
    4. DImprove
  8. 8When deciding the best format for documenting standard work, which of the following would be a main consideration?
    1. AStorage requirements and space considerations
    2. BEcological considerations for recycling efforts
    3. CDeadlines imposed by the internal review process
    4. DHow the documents will be used and at what skill level
  9. 9Six Sigma teams can face resistance to process changes. Which of the following is one way to mitigate such resistance?
    1. AProvide training to process owners and staff.
    2. BDocument changes in a new company policy.
    3. CPublish changes in the company newsletter.
    4. DGive briefings to the entire workforce.
  10. 10Which of these is a basic charting option to graphically represent a univariate data set collected over a specific period of time?
    1. AScatter diagram
    2. BPareto chart
    3. CRun chart
    4. DC chart

Information

Description
Quiz on LSSBB5, created by Brandis Thornton on 08/09/2017.
Language
English
Views
48
Tags
lssbb
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?