Quiz
MGT 360 Exam 2
Create a free account to finish this quiz
Save your progress and see your final score.
Already have an account? Sign in
Questions in this quiz (60)
1One of the prerequisites to job rotation is cross-training
- ATrue
- BFalse
2Fitting the task to the person in a work environment is know as job analysis
- ATrue
- BFalse
3___________ illustrate the improvement rate of workers as a job is repeated
- ALearning curves
- BProcess curves
- CLearning charts
- DProcess charts
4A Gnatt chart provides a visual display of the project schedule that includes scheduled start times, finish time, and available slack
- ATrue
- BFalse
5Project scheduling is recognized as the most critical element in the project management process
- ATrue
- BFalse
6In project management the term slack refers to the amount of time
- Ato complete an activity without delaying the project
- Ban activity can be delayed without delaying the project
- Cneeded to complete the entire project
- Drequired to complete the project's critical activities
7In general, the latest finish time for an activity is equal to
- Alatest finish time minus the activity time estimate
- Bthe minimum of the latest start times for the activities that immediately follow
- Cthe maximum of the latest start times for the activities that immediately follow
- Dthe average of the latest start times for the activities that immediately follow
8The slack time for an activity can be computed as
- Alatest start time (LS) - latest finish time (FL)
- Bearliest start time (ES) + earliest finish time (EF)
- Clatest start time (LS) - earliest start time (ES)
- Dlatest finish time (LF) + earliest finish time (EF)
9Using Table XX, the earliest finish (EF) time for activity D is

- A7 weeks
- B13 weeks
- C20 weeks
- D30 weeks
10Using Table XX, the latest start (LS) time for activity B is

- A5 weeks
- B8 weeks
- C13 weeks
- D14 weeks
11Using Table XX, the critical path for this project consists of activities

- AA-B-C-D-E-F
- BA-C-E-F
- CA-B-C-F
- DA-B-D-F
12Using Table XX, the time to complete the entire project is

- A20 weeks
- B30 weeks
- C36 weeks
- D39 weeks
13Using Table YY, the earliest finish (EF) time for activity C is

- A4 days
- B6 days
- C10 days
- D11 days
14Using Table YY, the latest start (LS) time for activity D is

- A8 days
- B11 days
- C19 days
- D12 days
15Using Table YY, the critical path for this project is

- AA-B-C
- BA-C-D
- CA-B-D
- DA-B-C-D
16Using Table YY, the amount of slack associated with activity C is

- A4 days
- B3 days
- C2 days
- D1 day
17Using Table YY, the time to complete the entire project would be

- A23 days
- B19 days
- C17 days
- D11 days
18Supply chain uncertainty and variability may result in incomplete and late orders
- ATrue
- BFalse
19Supply chain management focuses on integrating and managing the flow of manufactured goods, services, and related information
- ATrue
- BFalse
20Increasing supply chain transparency only magnifies the bullwhip effect
- ATrue
- BFalse
21Use of radio frequency identification (RFID) technology makes it possible for a customer to determine production schedules
- ATrue
- BFalse
22Inventory turnover is computed by
- Adividing the cost of goods sold by the average aggregate inventory value
- Bdividing the average aggregate inventory value by costs of goods sold
- Cmultiplying the average aggregate inventory value by cost of goods sold
- Dsubtracting cost of goods sold from the average aggregate inventory value
23A company that produces pritner cartridges had cost of goods sold last year of $629,462,423. The average values of inventory for raw materials, work-in-process, and finished goods are shown in the table.
If the company operates 50 weeks per year then the number of inventory turns would be
- A3.7 turns
- B2.5 turns
- C13.5 turns
- D28.3 turns
24Which of the following is not a key performance indicator used in supply chain management?
- Afill rate
- Bdays of supply
- Ccost of goods
- Dinventory turns
25Companies use outsourcing as a strategic move to transfer their core competencies to their suppliers
- ATrue
- BFalse
26Most companies are outsourcing in countries where higher prices for supply are offset by lower quality
- ATrue
- BFalse
27Cross docking is one of the reasons Walmart has such an efficient supply chain
- ATrue
- BFalse
28A value-added tax is based on the total cost of producing a product and not the value added by the supply chain partner
- ATrue
- BFalse
29Partnerships between customers and suppliers require suppliers to provide
- Ahigher quality
- Bprompt delivery
- Clower prices
- Dall of these answer choices are correct
30Distribution and transportation are often referred to as
- Alogistics
- Border fulfillment
- Ccustomer service
- Dmaintain inventories
31Long life, high capital cost, and low operating costs are associated with which mode of transportation?
- Apipeline
- Btrucking
- Cairline
- Dnone of these answer choices is correct
32Factors driving globalization of the supply chain include all of the following except
- Ainternational trade agreements
- Badvances in information techology
- Clower cost transportation
- Dgovernment intervention
33Sharing demand forecasts with supply chain members has resulted in an increased bullwhip effect
- ATrue
- BFalse
34The type of forecasting method selected depends on time frame, demand behavior and causes of behavior
- ATrue
- BFalse
35The trend towards continuous replenishment in supply chain design has shifted the need for accurate forecasts from long-term to short-term
- ATrue
- BFalse
36The demand behavior for skis is considered cyclical
- ATrue
- BFalse
37One reason time series methods are popular for forecasting is that they are relatively easy to use and understand
- ATrue
- BFalse
38Which of the following is not a type of predicable demand behavior?
- Atrend
- Brandom variation
- Ccycle
- Dseasonal pattern
39An exponential smoothing forecasting technique requires all of the following except
- Athe forecast for the current period
- Bthe actual demand for the current period
- Ca smoothing constant
- Dlarge amounts of historical demand data
40The smoothing constant in the exponential smoothing forecast
- Amust always be a value greater than 1.0
- Bmust always be a value less than 0.10
- Cmust be value between 0.0 and 1.0
- Dshould be equal to the time frame for the forecast
41Given the following demand data for the past five months, the four-period moving average forecast for June is

- A103.33
- B99.00
- C110.00
- D93.75
42For the demand values and the January forecast shown in the table below the exponential smoothing forecast for March using a = 0.30 is

- A489
- B486
- C483
- D480
43If the forecast for July was 3,300 and the actual demand for July was 3,250, then the exponential smoothing forecast for August a = 0.20 is
- A3,300
- B3,290
- C3,275
- D3,250
44Which of the following is a reason why a forecast can go out of control?
- Aa change in trend
- Ban irregular variation such as unseasonable weather
- Ca promotional campaign
- Dall of these answer choices are correct
45Correlation is a measure of the strength of the
- Anonlinear relationship between two dependent variables
- Bnonlinear relationship between a dependent and independent variable
- Clinear relationship between two dependent variables
- Dlinear relationship between a dependent and independent variable
46A forecasting model has produced the following forecasts:
The mean absolute deviation (MAD) for the end of May is
- A7.0
- B7.5
- C10.0
- D3.0
47Given the demand and forecast values shown in the table below,
the exponential smoothing forecasting for November using a = 0.35 is
- A552.45
- B553.50
- C554.55
- D557.50
48The conventional approach to inventory management is to maintain a level of inventory that reflects a compromise between inventory cost and customer service
- ATrue
- BFalse
49Carrying costs and ordering costs are inversely related
- ATrue
- BFalse
50Shortage costs are easier to determine than carrying costs or ordering costs
- ATrue
- BFalse
51Continuous inventory systems are primarily intended for lower cost items because they are easier to use, and require fewer resources
- ATrue
- BFalse
52In ABC analysis, each class of inventory requires different levels of inventory monitoring and control
- ATrue
- BFalse
53Annual demand for a product is 40,000 units. The product is used at a constant rate over the 365 days the company is open every year. The annual holding cost for the product is estimated to be $2.50 per unit and the cost of placing each order is $125. If the company orders according to the economic order quantity (EOQ) formula then its optimal order size for this product is
- A2,000 units
- B4,000 units
- C20,000 units
- D40,000 units
54Annual demand for a product is 40,000 units. The product is used at a constant rate over the 365 days the company is open every year. The annual holding cost for the product is estimated to be $2.50 per unit and the cost of placing each order is $125. If the company order according to the economic order quantity (EOQ) formula then its total annual inventory cost for this product is
- A$100,000
- B$50,000
- C$5,000
- D$2,500
55Which of the following is not an assumption of the EOQ model?
- Ademand is known and constant
- Bno shortages allowed
- Clead time is determined by quantity ordered
- Dorder quantity is received all at once
56The economic order quantity is most widely used for determining how much to order in
- Aa periodic inventory system
- Ba continuous inventory system
- Can on-demand inventory system
- Dnone of these answer choices are correct
57A restaurant currently uses 62,500 boxes of napkins each year at a constant daily rate. If the cost to order napkins is $200 per order and the annual carrying cost for one box of napkins is $1, then the economic order quantity for napkins is
- A62,500 boxes
- B10,000 boxes
- C5,000 boxes
- D2,500 boxes
58A restaurant currently uses 62,500 boxes of napkins each year at a constant daily rate. The cost to order napkins is $200 per order and annual carrying cost for one box of napkins is $1. If the restaurant orders the economic order quantity each time an order is place, then ________ orders are placed during the year
- A13
- B15
- C20
- D25
59The economic order quantity (EOQ) model determines the optimal order size that minimizes total annual inventory costs
- ATrue
- BFalse
60The number of orders can be calculated by dividing the daily demand rate, d, by the order quantity
- ATrue
- BFalse
Information
- Description
- Quiz on MGT 360 Exam 2, created by Mason Kimball on 08/11/2017.
- Author
- Mason Kimball
- Language
- English
- Views
- 6
- Rating
- No ratings yet Rate this quiz