Defects are less costly if detected in which of the following phases
Answer
Coding
Design
Requirements Gathering
Implementation
Question 2
Question
User Acceptance testing is
Answer
White box testing
Black box testing
Gray box testing
None of the above
Question 3
Question
Error guessing is a
Answer
Test verification techniques
Test execution techniques
Test control management techniques
Test data management technique
Question 4
Question
Histogram refers to
Answer
Bar chart
Run chart
Pareto diagram
Correlation diagram
Question 5
Question
Pareto principle advocates
Answer
20-80 rule
80-20 rule
40-60 rule
60-40 rule
Question 6
Question
Which one is not Structural Testing?
Answer
Regression
Parallel
Acceptance
Stress
Question 7
Question
Testing comes under which category of cost of quality?
Answer
Preventive
Appraisal
Failure
None of the above
Question 8
Question
Which of the following is not true about Incremental testing?
Answer
Top-Down approach can be used
Use of stubs or drivers are required
All modules need to be completed prior to testing
Bottom – up approach is also possible
Question 9
Question
Which of the following is not a part of test plan?
Answer
Scope
Mission
Objective
Risk
Question 10
Question
Which one is not Statistical Tool?
Answer
Cause and effect Graphing
Stratification
Run Chart
Regression Analysis
Question 11
Question
The ‘v’ represent the following term:
Answer
Verification and validation
Static testing and Dynamic testing
Black box testing and white box testing
Software development process and software testing process
Question 12
Question
Function point is a measure of
Answer
Effort
Complexity
Usability
Size
Question 13
Question
You are told to prepare a report on the most commonly occurring product defects. You review the software defect reports, which categories the defects of coding errors, requirement errors, documentation errors, etc. The best tool to report this information is
Answer
A histogram
A pareto diagram
A cause and effect diagram
A scatter plot
Question 14
Question
A statistical technique to assess, monitor and maintain the stability of a process is
Answer
Pareto chart
Control chart
Run chart
Histogram
Question 15
Question
The two types of incremental testing approaches are top down and bottom up approach.
Answer
True
False
Question 16
Question
If the measurement taken by the two people are same refers to the terms as
Answer
Reliability
Validity
Calibration
Ease of use and simplicity
Question 17
Question
Test Readiness review is conducted by the
Answer
Project manager
Test manager
Quality assurance personnel
User/Customer
Question 18
Question
To which phase will training cost fall?
Answer
Failure
Prevention
Build
Appraisal
Question 19
Question
You are performing a test to see that it complies with the user requirement that a certain field be populated by using a drop down box containing a list of values. What kind of testing are you doing?