1What are the contents that are in a work method statement?
- Aintroduction
- Bdescription of work
- Cresources required
- Ddescription of risks
- Econtrol measures
2what the aim and objective of swms are?
- Ato produce a document that can be used for induction of site personal
- Bto satisfy ohs requirements
- Cto identify and program resources to manage a project
- Dpart of the qa process
3What is the part that safety plays in a MS?
- Ait becomes a safe work method statement
- Bprocess of identify risks and hazards
- Creferred to a guide for carrying out work procedures
4What are the types of dewatering methods?
- Asheet piling
- Bcut off walls
- Cgrouting
- Dground freezing
5what dewatering method would be used suited for shallow excavations?
- Asteel sheet piling
- Bcute off walls
- Cjet grouting
6what is the most apropitae method for ground water control?
- Acut off walls
- Bslurry trench cut off
- Csteel sheet piling
7name the different soil stabilisation techniques?
- Aexcavate and fill
- Bvibro compaction
- Cvibro flotation
- Dvibro replacement
- Edynamic compaction
- Fsurcharging
- Gpressure grouting
- Hsand drains
- Iwick drains
8what are the underpinning methods?
- Acontinuous mass concrete
- Bpier and beam
- Cmini-piling
- Dpartial underpinning
- Epile and beam
- Fpre test method
9what method of underpinning would be used for footings to existing buildings and how would you carry it out?
- Amass concrete underpinning: it can be installed without specialised equipment and is cost effective.
- BPiled and raft systems: good for when outside of building is being restricted.
10what are the sequence of operations in earthworks?
- Aaccess
- Bgroundwater
- Cworking space
- Dadjacent properties
- Esetting out
- Fhandling excvated materials
- Gexisting services
- Hdepth of excavation
- Iexcavation support
11types of piled deep footing systems used in construction?
- Adriven
- Bbored: subsoil is cohesive
- Cpile caps: support structural load
- Dpiled raft footings: heavy structures on weak soils
12what are the methods of demolition?
- Ademolition by hand
- Bpulling down by wire rope: masonry and brick structures
- Cdemolition ball
- Dpusher arm machinery
- Einduced collapse
- Fdemolition by machine
13what are the different methods used to construct slip forming?
- Aupper platform
- Bmid section working platform
- Clower suspended floor
- Dadditional platforms can be used
14advantages of using precast concrete panels
- Astrength and structural capacity
- Bminimal waste
- Chigh thermal mass
- Ddurable
- Erealiablebly made
15what connects and joins pre cast panels?
- Aanchors
- Bjoints
16what is the construction process of concrete tilt up panels?
- Aprepare the site and cast the footings
- Bcast the building slab
- Capply high grade bond breaker
- Dapply architectural finishes
- Eplace reinforcement and tilt up hardware
- Finstall bracing inserts
- Gbrace wall panels to slabs on ground
- Hcoat building slab within formwork
- Ierect edge formwork on slab
- Jbuild formwork to sufficient height
Information
- Description
- Quiz on Exam Revison, created by leon vinci on 25/08/2019.
- Author
- leon vinci
- Language
- English
- Views
- 0
- Rating
- No ratings yet Rate this quiz