Seifert Exam 3

JAMES ANTONAKOS 35 questions 3.0 (2 ratings)

Take the quiz

Questions in this quiz (35)

  1. 1Which of the following items is not a key consideration in making a process selection decision?
    1. AConsider the availability and cost of labor
    2. BConsider market conditions.
    3. CConsider capital requirements.
    4. DConsider the state of technology for product not process
    5. EIn a plant-within-a-plant configuration, the plant is divided into sub-plants specializing in making certain types of products in order to increase throughput and customer responsiveness.
  2. 2Which of the following statements is incorrect?
    1. AIn Quality Function Deployment, the customer attributes are converted to Engineering characteristics (ECs) that are measurable and specific.
    2. BDFM is also known as the “House of Quality.”
    3. CModular design makes it possible to have relatively high product variety and low component variety.
    4. DIn QFD, the relative performance of competitors is evaluated in order to determine how the company’s product performs as compared to its competitors.
    5. EUsefulness is described in terms such as product features, performance, and reliability.
  3. 3Which of the following statements is incorrect?
    1. AAttaining a competitive advantage via the operations side of the business often involves the development of patented or proprietary technology or equipment.
    2. BAn effective supply chain strategy should be aimed at achieving a sustainable competitive advantage for only the final customer in the supply chain.
    3. CSustainability refers to minimizing or eliminating the environmental impact of operations
    4. DAttaining a competitive advantage via the operations side of the business often involves having the ability to serve a new market before competitors.
  4. 4Which of the following statements is incorrect?
    1. AThe process design phase should occur simultaneously with product design.
    2. BSimultaneous process and product design will help minimize product introduction lead times.
    3. CIn the pilot production and testing phase, prototypes need to be built in order to evaluate.
    4. DSimultaneous process and product design may be more problematic because the design may be incompatible with the manufacturing equipment.
  5. 5Which of the following statements is incorrect?
    1. ADesign greatly affects operations because existing processes and products can constrain the technology available for new products.
    2. BProduct design refers to either a physical, manufactured product or a service.
    3. CStreamlining the number of similar parts helps minimize the inadvertent use of the wrong part, reduces inventory costs as less different storage locations are needed, and allows a firm to potentially gain price concessions as larger order quantities can be placed.
    4. DIn the market pull strategy for new product introduction, the market demands a product and a company has to figure out how to make it (even if they do not currently have the technology to do so OR the manufacturing processes must be invented).
    5. EThe market push strategy is a push strategy because the market wants the product and is therefore pushing the product to market as compared to the supplier trying to force the market to want their product.
  6. 6Which of the following statements is incorrect?
    1. AA firm’s operations strategy is usually derived from its business strategy.
    2. BA firm’s corporate strategy is usually derived from its business strategy.
    3. CAn operations strategy usually contains (among other things) objectives and strategic decisions.
    4. DAs an organization’s strategies flow from corporate strategy to determinations of distinctive competencies, the strategies become more and more specific.
  7. 7Which of the following statements is incorrect?
    1. AAt the end of the concept development phase, one of the concepts will be selected for the next development stage.
    2. BThe product design phase is concerned with designing the new product/service.
    3. CSupplier chain collaboration includes working with customers to identify important & latent needs.
    4. DThe drawings and specifications derived in the process design phase will be used to build production prototypes for testing and evaluation.
  8. 8Which of the following statements is incorrect?
    1. AOperations strategies and decisions should fulfill the needs of the business without adding competitive advantage to the firm.
    2. BIf a competitor is more productive (e.g., lower costs) and of comparable quality, the competitor will be able to offer the same product at a lower cost – thus more value for the money.
    3. CValue can be created only by operations and supply chains that are more productive than competitors’ in relation to the company’s chosen markets.
    4. DThe cross-functional coordination of decision-making is facilitated by an operations strategy that is developed by a team of managers from across the entire business.
  9. 9Which of the following statements is incorrect?
    1. ALasting needs are those customer needs/wants that are ultimately desired but not explicitly conveyed to the supplier.
    2. BIn supply chain collaboration, suppliers seek more involvement in customer design decisions.
    3. CSequential product design is when each functional unit completes its portion of the design process before the next functional unit begins their portion.
    4. DIn supply chain collaboration, key suppliers are an important part of the design process in order to enhance product design.
    5. EOnly input from key suppliers is sought because they are expected to have needed expertise into the design of critical parts.
  10. 10Which of the following statements is incorrect?
    1. AIn MTO, purchased parts may have to be ordered when customer order is placed thus extending delivery time.
    2. BTo keep workers busy and anticipate potentially periods of under-capacity, Marketing and Production Control often have to forecast product demand.
    3. CProduction planning uses the forecast as well as current orders to plan how parts will flow through the factory.
    4. DFor batch processing, the flexibility is usually poor because changing from one type of product to another is often very time-consuming and expensive.
    5. EInventory Management is responsible for assuring that the quantity of parts at each operation (or work center) actually match the number of parts that are actually there.

Information

Description
MQM exam 3