  1. 1The inputs for developing a test plan are taken from:
    1. AProject plan
    2. BBusiness plan
    3. CSupport plan
    4. DNone of the above
  2. 2The process starting with the terminal modules is called:
    1. ATop-down integration
    2. BBottom-up integration
    3. CNone of the above
    4. DModule integration
  3. 3If an expected result is not specified then:
    1. AWe cannot run the test
    2. BIt may be difficult to repeat the test
    3. CIt may be difficult to determine if the test has passed or failed
    4. DWe cannot automate the user inputs
  4. 4Which of the following could be a reason for a failure.
    1) Testing fault
    2) Software fault
    3) Design fault
    4) Environment Fault
    5) Documentation Fault
    1. A2 is a valid reason; 1, 3, 4 & 5 are not
    2. B1, 2, 3, 4 are valid reasons; 5 is not
    3. C1,2,3 are valid reasons; 4 & 5 are not
    4. DAll of them are valid reasons for failure
  5. 5Test are prioritized so that:
    1. AYou shorten the time required for testing
    2. BYou do the best testing in the time available
    3. CYou do more effective testing
    4. DYou find more faults
  6. 6Which of the following is NOT a static testing technique?
    1. AError guessing
    2. BWalkthrough
    3. CData flow analysis
    4. DInspections
  7. 7Which of the following statements about component testing is NOT true?
    1. AComponent testing should be performed by development
    2. BComponent testing is also know as isolation or module testing
    3. CComponent testing should have completion criteria planned
    4. DComponent testing does not involve regression testing
  8. 8During which test activity could faults be found most cost effectively?
    1. AExecution
    2. BDesign
    3. CPlanning
    4. DCheck Exit criteria completion
  9. 9Which, in general, is the least required skill of a good tester?
    1. ABeing diplomatic
    2. BAble to write software
    3. CHaving good attention to detail
    4. DAble to be relied on
  10. 10The purpose of requirement phase is:
    1. ATo freeze requirements
    2. BTo understand user needs
    3. CTo define the scope of testing
    4. DAll of the above

Information

Description
Medium ISTQB Foundation Level Quiz on Foundation Level Paper 3, created by Maximo Malirong on 19/04/2016.
Language
English
Views
3
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?