1 Testing will be performed by the people at client own locations: (1M)
- AAlpha testing
- BField testing
- CPerformance testing
- DSystem testing
2 System testing should investigate: (2M)
- ANon-functional requirements only not Functional requirements
- BFunctional requirements only not non-functional requirements
- CNon-functional requirements and Functional requirements
- DNon-functional requirements or Functional requirements
3 Which is the non-functional testing? (1M)
- APerformance testing
- BUnit testing
- CRegression testing
- DSanity testing
4Who is responsible for document all the issues, problems and open point that were identified during the review meeting? (2M)
- AModerator
- BScribe
- CReviewers
- DAuthor
5What is the main purpose of Informal review? (2M)
- AInexpensive way to get some benefit
- BFind defects
- CLearning, gaining understanding, effect finding
- DDiscuss, make decisions, solve technical problems
6Purpose of test design technique is: (1M)
- AIdentifying test conditions only, not Identifying test cases.
- BNot Identifying test conditions, Identifying test cases only.
- CIdentifying test conditions and Identifying test cases.
- DIdentifying test conditions or Identifying test cases.
7___________ technique can be used to achieve input and output coverage. (1M)
- ABoundary value analysis
- BEquivalence partitioning
- CDecision table testing
- DState transition testing
8Use cases can be performed to test. (2M)
- APerformance testing
- BUnit testing
- CBusiness scenarios
- DStatic testing
9________________ testing is performed at the developing organization’s site. (1M)
- AUnit testing
- BRegression testing
- CAlpha testing
- DIntegration testing
10The purpose of exit criteria is: (2M)
- ADefine when to stop testing
- BEnd of test level
- CWhen a set of tests has achieved a specific pre condition
- DAll of the above
11Which is not the project risks? (2M)
- ASupplier issues
- BOrganization factors
- CTechnical issues
- DError-prone software delivered
12 Poor software characteristics are: (3M)
- AOnly Project risks
- BOnly Product risks
- CProject risks and Product risks
- DProject risks or Product risks
13________ and ________ are used within individual workbenches to produce the right output products. (2M)
- ATools and techniques
- BProcedures and standards
- CProcesses and walkthroughs
- DReviews and update
14The software engineer's role in tool selection is: (3M)
- ATo identify, evaluate, and rank tools, and recommend tools to management.
- BTo determine what kind of tool is needed, then find it and buy it.
- CTo initiate the tool search and present a case to management.
- DTo identify, evaluate and select the tools.
15A _____ is the step-by-step method followed to ensure that standards are met. (2M)
- ASDLC
- BProject Plan
- CPolicy
- DProcedure
16Which of the following is the standard for the Software product quality? (1M)
- AISO 1926
- BISO 829
- CISO 1012
- DISO 1028
17Which is not the testing objectives? (1M)
- AFinding defects.
- BGaining confidence about the level of quality and providing information.
- CPreventing defects.
- DDebugging defects.
18Bug life cycle. (1M)
- AOpen, Assigned, Fixed, Closed
- BOpen, Fixed, Assigned, Closed
- CAssigned, Open, Closed, Fixed
- DAssigned, Open, Fixed, Closed
19Which is not the software characteristics? (1M)
A. B. C. D.- AReliability
- BUsability
- CScalability
- DMaintainability
20Which is not a testing principle? (2M)
- AEarly testing
- BDefect clustering
- CPesticide paradox
- DExhaustive testing
21‘X’ has given a data on a person age, which should be between 1 to 99. Using BVA which is the appropriate one? (3M)
- A0,1,2,99
- B1, 99, 100, 98
- C0, 1, 99, 100
- D–1, 0, 1, 99
22Which is not the fundamental test process? (1M)
- APlanning and control
- BTest closure activities
- CAnalysis and design
- DNone
23Which is not a Component testing (2M)
A. B.
C. D.- ACheck the memory leaks
- BCheck the robustness
- CCheck the branch coverage
- DCheck the decision tables
24PDCA is known as: (1M)
- APlan, Do, Check, Act
- BPlan, Do, Correct, Act
- CPlan, Debug, Check, Act
- DPlan, Do, Check, Accept
25Contract and regulation testing is a part of: (2M)
- ASystem testing
- BAcceptance testing
- CIntegration testing
- DSmoke testing
26Which is not a black box testing technique? (1M)
- AEquivalence partition
- BDecision tables
- CTransaction diagrams
- DDecision testing
27Arc testing is known as: (2M)
- ABranch testing
- BAgile testing
- CBeta testing
- DAd-hoc testing
28A software model that can’t be used in functional testing. (2M)
- AProcess flow model
- BState transaction model
- CMenu structure model
- DPlain language specification model
29 Find the mismatch. (2M)
A.
B.
C.
D. Configuration management tools – Check for consistence- ATest data preparation tools – Manipulate Data bases
- BTest design tools – Generate test inputs
- CRequirement management tools – Enables individual tests to be traceable
30The principle of Cyclomatic complexity, considering L as edges or links, N as nodes, P as independent paths. (2M)
- AL-N +2P
- BN-L +2P
- CN-L +P
- DN-L +Q
31FPA is used to: (2M)
- ATo measure the functional requirements of the project.
- BTo measure the size of the functionality of an Information system.
- CTo measure the functional testing effort.
- DTo measure the functional flow.
32Which is not a test Oracle? (2M)
- AThe existing system (For a bench mark)
- BThe code
- CIndividual’s knowledge
- DUser manual
33Find the correct flow of the phases of a formal review. (3M)
- APlanning, Review meeting, Rework, Kick off
- BPlanning, Individual preparation, Kick off, Rework
- CPlanning, Review meeting, Rework, Follow up
- DPlanning, Individual preparation, Follow up, Kick off
34Stochastic testing using statistical information or operational profiles uses the following method: (3M)
- AHeuristic testing approach
- BMethodical testing approach
- CModel based testing approach
- DProcess or standard compliant testing approach
35A project that is in the implementation phase is six weeks behind schedule. The delivery date for the product is four months away. The project is not allowed to slip the delivery date or compromise on the quality standards established for this product. Which of the following actions would bring this project back on schedule? (3M)
- AEliminate some of the requirements that have not yet been implemented.
- BAdd more engineers to the project to make up for lost work.
- CAsk the current developers to work overtime until the lost work is recovered.
- DHire more software quality assurance personnel.
36One person has been dominating the current software process improvement meeting. Which of the following techniques should the facilitator use to bring other team members into the discussion? (3M)
- AConfront the person and ask that other team members be allowed to express their opinions.
- BWait for the person to pause, acknowledge the person’ s opinion, and ask for someone else’ s opinion.
- CSwitch the topic to an issue about which the person does not have a strong opinion.
- DExpress an opinion that differs from the person’ s opinion in order to encourage others to express their ideas.
37Maintenance releases and technical assistance centers are examples of which of the following costs of quality? (3M)
- AExternal failure
- BInternal failure
- CAppraisal
- DPrevention
Information
- Description
- Medium ISTQB Foundation Level Quiz on Foundation Level Paper 7, created by Maximo Malirong on 22/04/2016.
- Author
- Maximo Malirong
- Language
- English
- Views
- 5
- Tags
- Rating
- No ratings yet Rate this quiz