P4 L2: Capacity planning
This quiz has question types that open in the usual player.
Questions in this quiz (17)
1Challenges in capacity planning:
-Capacity is a [blank_start]soft[blank_end], malleable constraint that depends on everything
-There are many possible causes of [blank_start]capacity frictions[blank_end]: lead times, lumpiness, fixed costs
-Capacity requires large and irreversible [blank_start]investment[blank_end]
-Capacity decisions can be [blank_start]political[blank_end]
-Measuring and valuing capacity [blank_start]shortfall[blank_end] is not obvious
-Capacity investment involves [blank_start]long-run planning[blank_end] under uncertainty: this is arguably the greatest challenge for capacity strategy.
Some capacity decisions include:
-[blank_start]Sizing[blank_end]: how much capacity to invest in?
-[blank_start]Timing[blank_end]: when to increase or reduce resources?
-[blank_start]Type[blank_end]: what kinds of resources are best?
-[blank_start]Location[blank_end]: where should resources be located?
The three main capacity sizing drivers are:
-[blank_start]Forecasting[blank_end]
-[blank_start]Shortage[blank_end] cost
-[blank_start]Safety[blank_end] [blank_start]capacity[blank_end] cost.- Asoft
- Bcapacity frictions
- Cinvestment
- Dpolitical
- Eshortfall
- Flong-run planning
- GSizing
- HTiming
- IType
- JLocation
- KForecasting
- LShortage
- MSafety
- Ncapacity
2Name the capacity sizing drivers.

- AForecasting
- BShortage cost
- CSafety capacity cost
3Impact of reducing setup times:
-[blank_start]Smaller batch sizes[blank_end] become economical
-Reduced cost of [blank_start]setup labour[blank_end] required
-Increase production [blank_start]capacity[blank_end] (on bottlenecks)
-Reduce [blank_start]scale[blank_end] of potential quality problems and hence waste- ASmaller batch sizes
- Bsetup labour
- Ccapacity
- Dscale
4[blank_start]Theoretical[blank_end] capacity is the maximum possible output rate, while the [blank_start]actual[blank_end] capacity is a realistic estimate of the achievable output rate
A firm will not make total use of its [blank_start]maximum available time[blank_end] (MAT). Time losses are made in the form of:
-[blank_start]Quality[blank_end] losses
-[blank_start]Slow[blank_end] running equipment
-Equipment [blank_start]idling[blank_end]
-[blank_start]Breakdown failure[blank_end]
-[blank_start]Setup[blank_end] and changeovers
-[blank_start]Unplanned[blank_end] time not working
This leaves [blank_start]valuable[blank_end] operating time which the firm must make use of.
The MAT minus availability losses (unplanned time not working, setup and changeover times, and breakdown failures) leaves the total operating time (TOT).
The availability rate, AR = [blank_start]TOT[blank_end] / [blank_start]MAT[blank_end].
The TOT minus speed losses (equipment idling and slow running equipment) leaves the net operating time (NOT).
The performance rate, PR = [blank_start]NOT[blank_end] / [blank_start]TOT[blank_end].
The NOT minus quality losses leaves the valuable operating time (VOT).
The quality rate, QR = [blank_start]VOT[blank_end] / [blank_start]NOT[blank_end].
The overall equipment effectiveness (OEE) = [blank_start]AR[blank_end] x [blank_start]PR[blank_end] x [blank_start]QR[blank_end]- ATheoretical
- Bactual
- Cmaximum available time
- DQuality
- ESlow
- Fidling
- GBreakdown failure
- HSetup
- IUnplanned
- Jvaluable
- KTOT
- LMAT
- MNOT
- NTOT
- OVOT
- PNOT
- QAR
- RPR
- SQR
5Label the terms and expressions in this diagram of theoretical vs actual capacity

- Amaximum available time
- Btotal operating time
- Cnet operating time
- Dvaluable operating time
- Eb
- Fa
- Gc
- Hb
- Id
- Jc
- KAR
- LPR
- MQR
6[blank_start]Ideal[blank_end] demand is [blank_start]smooth[blank_end] and predictable. The total demand is equal to the maximum [blank_start]output capacity[blank_end] of resources, and any changes are [blank_start]perfectly forecast[blank_end] in sufficient time to allow capacity change.
However, [blank_start]real[blank_end] demand is usually not predictable; demand has [blank_start]peaks[blank_end] and varies throughout product life cycle and with competition. This leaves long, medium and short term capacity planning challenges.- AIdeal
- Bsmooth
- Coutput capacity
- Dperfectly forecast
- Ereal
- Fpeaks
7There are three steps in capacity planning and control:
Step 1: Measure aggregate [blank_start]demand[blank_end] and [blank_start]capacity[blank_end]
Step 2: Identify the alternative [blank_start]capacity plans[blank_end]
Step 3: Choose the most [blank_start]appropriate[blank_end] capacity plan
There are three basic strategies for long-term capacity planning: capacity [blank_start]lead[blank_end], capacity [blank_start]lag[blank_end], and [blank_start]smoothing[blank_end] with inventory.- Ademand
- Bcapacity
- Ccapacity plans
- Dappropriate
- Elead
- Flag
- Gsmoothing
8Name the long-term capacity planning strategies

- Acapacity lead
- Bcapacity lag
- Csmoothing with inventory
9There are three options available for coping with variations in demand:
1. [blank_start]Level capacity[blank_end] plan: processing capacity is set at a uniform level throughout the planning period, regardless of the fluctuations in forecast demand
2. [blank_start]Chase demand[blank_end] plan: attempts to match capacity closely to the varying levels of forecast demand
3. [blank_start]Optimal capacity[blank_end] plan: balances the costs of levelling and varying the capacity
4. [blank_start]Demand management[blank_end]: change demand to suit capacity- ALevel capacity
- BChase demand
- COptimal capacity
- DDemand management
10Name the medium-term capacity planning solution

- Alevel capacity plan
11The level capacity plan aims to keep capacity at a [blank_start]uniform level[blank_end] throughout the planning period. The same number of staff operate the same processes, and finished goods are transferred to inventory in anticipation of sales at a later time. This is only suitable for [blank_start]non-perishable[blank_end] goods.
The advantages of the level capacity plan are:
-Stable [blank_start]employment[blank_end] patterns
-High [blank_start]process utilisation[blank_end]
-High [blank_start]productivity[blank_end] with low unit costs
The disadvantages of the level capacity plan are:
-Considerable [blank_start]inventory[blank_end] costs
-[blank_start]Decision making[blank_end]: what to produce for inventory vs immediate sale
-High [blank_start]over/under utilisation[blank_end] levels for service operations- Auniform level
- Bnon-perishable
- Cemployment
- Dprocess utilisation
- Eproductivity
- Finventory
- GDecision making
- Hover/under utilisation
12Name the medium-term capacity planning solution

- Achase demand plan
13In the [blank_start]optimal capacity[blank_end] plan, mathematical programming is used to find the best or optimal solution to a problem that requires a decision or set of decisions about how best to use a set of [blank_start]limited resources[blank_end] in order to achieve a stated goal or objectives.
A [blank_start]linear programming[blank_end] model seeks to maximise or minimise a linear objective function, subject to a set of linear constraints, by determining values of nonnegative real decision variables.- Aoptimal capacity
- Blimited resources
- Clinear programming
14Name the medium term capacity planning strategy

- Ademand management
15[blank_start]Short[blank_end] term capacity planning methods include:
-Managing the [blank_start]order mix[blank_end]
-Scheduling [blank_start]downtime[blank_end] appropriately
-[blank_start]Overtime[blank_end] planning
-[blank_start]Outsourcing[blank_end]- AShort
- Border mix
- Cdowntime
- DOvertime
- EOutsourcing
16Key issues relating to queues in balancing supply and demand are:
-Unacceptable [blank_start]queuing time[blank_end] vs unacceptably [blank_start]low utilisation[blank_end] of servers/machines
-Effect of [blank_start]variation[blank_end] in inter-arrival and service/processing times - capacity and demand rarely [blank_start]match[blank_end]
-It is important to be able to [blank_start]predict[blank_end] the expected waiting times and average utilisation of a processing system
Analysis of queues
-What is the average [blank_start]time[blank_end] an order (or a customer) spends
--In the [blank_start]system[blank_end]?
--In the [blank_start]queue[blank_end]?
-What is the average [blank_start]length[blank_end] of the queue?
-What is the average resource [blank_start]utilisation[blank_end]?
-When is it justified to [blank_start]increase[blank_end] resources?
The [blank_start]arrival rate[blank_end] of a queue is λ
The [blank_start]service rate[blank_end] is μ
We let ρ = λ [blank_start]/[blank_end] μ
pi = the probability of i orders being [blank_start]in the system[blank_end] after reaching equilibrium
P0 = 1 - ρ
Pi = p^i (1 - ρ)- Aqueuing time
- Blow utilisation
- Cvariation
- Dmatch
- Epredict
- Ftime
- Gsystem
- Hqueue
- Ilength
- Jutilisation
- Kincrease
- Larrival rate
- Mservice rate
- N/
- Oin the system
17What do these equations mean?
(do not shorten answers; let them run off the answer box)
- AAverage number of customers in the syste
- BAverage queue length
- CAverage time spent in system
- DAverage waiting time
- EServer utilisation
Information
- Description
- Quiz on P4 L2: Capacity planning, created by Lizzie O on 23/03/2017.
- Author
- Lizzie O
- Language
- English
- Views
- 0
- Rating
- No ratings yet Rate this quiz
More on Capacity Planning and Constraint Management