P4 L2: Capacity planning

Lizzie O 17 questions

Take the quiz

This quiz has question types that open in the usual player.

Questions in this quiz (17)

  1. 1Challenges in capacity planning:

    -Capacity is a [blank_start]soft[blank_end], malleable constraint that depends on everything
    -There are many possible causes of [blank_start]capacity frictions[blank_end]: lead times, lumpiness, fixed costs
    -Capacity requires large and irreversible [blank_start]investment[blank_end]
    -Capacity decisions can be [blank_start]political[blank_end]
    -Measuring and valuing capacity [blank_start]shortfall[blank_end] is not obvious
    -Capacity investment involves [blank_start]long-run planning[blank_end] under uncertainty: this is arguably the greatest challenge for capacity strategy.

    Some capacity decisions include:
    -[blank_start]Sizing[blank_end]: how much capacity to invest in?
    -[blank_start]Timing[blank_end]: when to increase or reduce resources?
    -[blank_start]Type[blank_end]: what kinds of resources are best?
    -[blank_start]Location[blank_end]: where should resources be located?

    The three main capacity sizing drivers are:
    -[blank_start]Forecasting[blank_end]
    -[blank_start]Shortage[blank_end] cost
    -[blank_start]Safety[blank_end] [blank_start]capacity[blank_end] cost.
    1. Asoft
    2. Bcapacity frictions
    3. Cinvestment
    4. Dpolitical
    5. Eshortfall
    6. Flong-run planning
    7. GSizing
    8. HTiming
    9. IType
    10. JLocation
    11. KForecasting
    12. LShortage
    13. MSafety
    14. Ncapacity
  2. 2Name the capacity sizing drivers.Image for question 2
    1. AForecasting
    2. BShortage cost
    3. CSafety capacity cost
  3. 3Impact of reducing setup times:
    -[blank_start]Smaller batch sizes[blank_end] become economical
    -Reduced cost of [blank_start]setup labour[blank_end] required
    -Increase production [blank_start]capacity[blank_end] (on bottlenecks)
    -Reduce [blank_start]scale[blank_end] of potential quality problems and hence waste
    1. ASmaller batch sizes
    2. Bsetup labour
    3. Ccapacity
    4. Dscale
  4. 4[blank_start]Theoretical[blank_end] capacity is the maximum possible output rate, while the [blank_start]actual[blank_end] capacity is a realistic estimate of the achievable output rate

    A firm will not make total use of its [blank_start]maximum available time[blank_end] (MAT). Time losses are made in the form of:
    -[blank_start]Quality[blank_end] losses
    -[blank_start]Slow[blank_end] running equipment
    -Equipment [blank_start]idling[blank_end]
    -[blank_start]Breakdown failure[blank_end]
    -[blank_start]Setup[blank_end] and changeovers
    -[blank_start]Unplanned[blank_end] time not working
    This leaves [blank_start]valuable[blank_end] operating time which the firm must make use of.

    The MAT minus availability losses (unplanned time not working, setup and changeover times, and breakdown failures) leaves the total operating time (TOT).
    The availability rate, AR = [blank_start]TOT[blank_end] / [blank_start]MAT[blank_end].

    The TOT minus speed losses (equipment idling and slow running equipment) leaves the net operating time (NOT).
    The performance rate, PR = [blank_start]NOT[blank_end] / [blank_start]TOT[blank_end].

    The NOT minus quality losses leaves the valuable operating time (VOT).
    The quality rate, QR = [blank_start]VOT[blank_end] / [blank_start]NOT[blank_end].

    The overall equipment effectiveness (OEE) = [blank_start]AR[blank_end] x [blank_start]PR[blank_end] x [blank_start]QR[blank_end]
    1. ATheoretical
    2. Bactual
    3. Cmaximum available time
    4. DQuality
    5. ESlow
    6. Fidling
    7. GBreakdown failure
    8. HSetup
    9. IUnplanned
    10. Jvaluable
    11. KTOT
    12. LMAT
    13. MNOT
    14. NTOT
    15. OVOT
    16. PNOT
    17. QAR
    18. RPR
    19. SQR
  5. 5Label the terms and expressions in this diagram of theoretical vs actual capacityImage for question 5
    1. Amaximum available time
    2. Btotal operating time
    3. Cnet operating time
    4. Dvaluable operating time
    5. Eb
    6. Fa
    7. Gc
    8. Hb
    9. Id
    10. Jc
    11. KAR
    12. LPR
    13. MQR
  6. 6[blank_start]Ideal[blank_end] demand is [blank_start]smooth[blank_end] and predictable. The total demand is equal to the maximum [blank_start]output capacity[blank_end] of resources, and any changes are [blank_start]perfectly forecast[blank_end] in sufficient time to allow capacity change.

    However, [blank_start]real[blank_end] demand is usually not predictable; demand has [blank_start]peaks[blank_end] and varies throughout product life cycle and with competition. This leaves long, medium and short term capacity planning challenges.
    1. AIdeal
    2. Bsmooth
    3. Coutput capacity
    4. Dperfectly forecast
    5. Ereal
    6. Fpeaks
  7. 7There are three steps in capacity planning and control:
    Step 1: Measure aggregate [blank_start]demand[blank_end] and [blank_start]capacity[blank_end]
    Step 2: Identify the alternative [blank_start]capacity plans[blank_end]
    Step 3: Choose the most [blank_start]appropriate[blank_end] capacity plan

    There are three basic strategies for long-term capacity planning: capacity [blank_start]lead[blank_end], capacity [blank_start]lag[blank_end], and [blank_start]smoothing[blank_end] with inventory.
    1. Ademand
    2. Bcapacity
    3. Ccapacity plans
    4. Dappropriate
    5. Elead
    6. Flag
    7. Gsmoothing
  8. 8Name the long-term capacity planning strategiesImage for question 8
    1. Acapacity lead
    2. Bcapacity lag
    3. Csmoothing with inventory
  9. 9There are three options available for coping with variations in demand:

    1. [blank_start]Level capacity[blank_end] plan: processing capacity is set at a uniform level throughout the planning period, regardless of the fluctuations in forecast demand
    2. [blank_start]Chase demand[blank_end] plan: attempts to match capacity closely to the varying levels of forecast demand
    3. [blank_start]Optimal capacity[blank_end] plan: balances the costs of levelling and varying the capacity
    4. [blank_start]Demand management[blank_end]: change demand to suit capacity
    1. ALevel capacity
    2. BChase demand
    3. COptimal capacity
    4. DDemand management
  10. 10Name the medium-term capacity planning solutionImage for question 10
    1. Alevel capacity plan

Information

Description
Quiz on P4 L2: Capacity planning, created by Lizzie O on 23/03/2017.
Author
Lizzie O
Language
English
Views
0
Rating
No ratings yet
Rate this quiz
Rate this quiz

More on Capacity Planning and Constraint Management

Feedback

What is it about?

What should we add next?