GoConqr has a new look! Let us know what you think.

Quiz

Untitled

m b 50 questions

Take the quiz

Questions in this quiz (50)

  1. 1What is NOT an appropriate method for reducing separation of aggregates?
    1. ALoading truck properly
    2. BAdding water to mix
    3. CKeep paver hopper half full between truckloads
    4. DStopping and starting truck rapidly
  2. 2Which is NOT an added layer in asphalt paving?
    1. ASub-base
    2. Bbase
    3. CWearing
    4. DSub-grade
  3. 3Which of the following is true?


    1. APavers push dump trucks during the paving process
    2. BDozers are used to spread Hot Mix Asphalt during the pouring process
    3. CThe primary advantage of recycling asphalt is the large amount of cost savings
    4. DPavers provide ideal compaction of the Hot Mix Asphalt
  4. 4What machine can be used to control dust emissions in a mixing plant?



    1. AAir purifiers
    2. BCentrifugal dust collectors
    3. CVacuum
    4. DDust barriers
  5. 5How are aggregates separated and placed in their respective storage bins, based on their
    size, at an asphalt plant?
    1. AAggregate is unloaded into stockpiles and a conveying belt system transports the
      aggregate to the bins
    2. BAggregate is unloaded directly into their respective bins via dump trucks
    3. CAggregate is unloaded in a large sieve, which distributes the aggregate into bins based
      on their size
    4. DAggregate is unloaded into stockpiles and a loader directly places the aggregate into
      bins
  6. 6If applicable what is the most economical method to dispose of dredging soil?
    1. AUse soil in another dredging project
    2. BCapping and monitoring on land disposal site
    3. CCapping and monitoring underwater disposal site
    4. DSeparation and chemical washing soil
  7. 7The most important non-economical consideration for choosing the type of dredge is? Not the size of
    dredger.
    1. ASoil classification
    2. BDredging depth
    3. CSoil disposal method
    4. DEnvironmental impact
  8. 8In the case study the IMS 7015-Hp was chosen over the other alternatives because of which final
    consideration?
    1. AUnit operational cost for dredge soil $/m3
    2. BProduction rate of the dredger equipment
    3. CSoil classification
    4. DDisposal distance
  9. 9Which type of soil classification would not be recommended for hydraulic dredging machine?
    1. ARocks
    2. BGravel
    3. CSand
    4. DClay
  10. 10Since separation and chemical washing treatment for dredge soil is very expensive. Why would a
    project use this method of disposal?
    1. AIt’s used for contaminated soils
    2. BUsed before bring material to another project
    3. CUsed to increase G.D.P
    4. DRequired by law to be done on all projects

Information

Description
Quiz on Untitled, created by m b on 29/03/2017.
Author
m b
Language
English
Views
35
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?