Quiz
Quiz 6: Software Testing
Dieses Quiz hat ein Zeitlimit und öffnet sich deshalb im gewohnten Player.
Fragen in diesem Quiz (7)
1______________ is testing in which software components, hardware components, or both are combined and tested to evaluate the interaction between them.
- AWhite box testing
- BBlack box testing
- CRegression testing
- DIntegration testing
- EUnit testing
2________________ is selective retesting of a system or component to verify that modifications have not caused unintended effects and that the system or component still complies with its specified requirements.
- AUnit testing
- BRegression testing
- CBlack-box testing
- DWhite-box testing
- EIntegration testing
3Software engineers write white-box test cases to examine whether the codes are written correctly. The testing is important for ensuring the code is solid before it is integrated with other code. Once the code is integrated into the code base, the cause of an observed failure is more difficult to find. Also, since the software engineer writes and runs the tests him or herself, companies often do not track the test failures that are observed; making these types of defects the most “private” to the software engineer. We all prefer to find our own mistakes and to have the opportunity to fix them without others knowing. Approximately 65% of all bugs can be caught in this testing. The best type of testing described above is ___________________.
- AUnit testing
- BRegression testing
- CSmoke testing
- DData-flow testing
- EIntegration testing
4This testing technique examines the basic program structure and it derives the test data from the program logic; ensuring all statements and conditions are executed at least once. It is called as _______________.
- ABlack-box testing
- BWhite-box testing
- CGrey-box testing
- DBeta testing
- EAcceptance testing
5Which software process model requires to start testing activities when the software development activities start? (You may answer more than 1)
- AV Model
- BSpiral model
- CAgile
- DWaterfall model
- EPrototyping model
6Assuming the following program flow chart is derived from a part of implementation. Identify the independent paths for the graph using the McCabe’s cyclomatic complexity method.
Calculate the cyclomatic complexity value for the figure.
- A4
- B5
- C6
- D7
- E8
7Based on the flow graph, identify the possible independent paths. You need to identify all the independent paths.

- A1-2-7-8-9-10
- B1-2-7-8-10
- C1-2-7-10
- D1-2-3-4-5-10
- E1-2-3-4-6-10
- F1-2-3-10
- G1-2-8-9-10
- H1-2-3-5-10
Informationen
- Beschreibung
- Quiz am Quiz 6: Software Testing, erstellt von Azlin Nordin am 10/04/2019.
- Autor
- Azlin Nordin
- Sprache
- English
- Aufrufe
- 3
- Schlagwörter
- Bewertung
- Noch keine Bewertungen Bewerte dieses Quiz