GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

ICT Unit 1 flashcards

sophiegreer3 ICT A-Level Englisch 5,0Durchschnittliche Bewertung 5,0 von 5 (1 Bewertung) 50 Karten

ICT Unit 1 flashcards

Karten in diesem Stapel (50)

  1. 14 data typesText,Still and Moving Images,Numbers,
    Sound
  2. 2List manual input devicesKeyboard
    Mouse
    Concept Keyboards
    Touch Screen
    Graphics Tablet
    Speech recognition
  3. 3List automatic input devicesCard readers
    RFID
    Scanners
    OMR
    OCR
    Barcode readers
    MICR
    Webcam
    Camera
    Sound and Video input
  4. 4How can input devices be adapted for people with disabilites?The pointer speed of the mouse can be adjusted
    Speed of mouse clicks can be adjusted
    Buttons on mouse can be set for right or left handed people
    A large trackball can be used for a mouse
    A foot mouse can be used
  5. 5What five things should you think about when deciding on an input device?Type of data
    Volume of data
    User preferences
    Cost considerations
    Where device will be used
  6. 6List output devicesScreens and monitors (CRT,LCD,Projector,Plasma screens,Smart Board)
    Printers (Laser,Inkjet,Dot Matrix)
    Plotters
    Speakers
  7. 7How can output devices be changed to help people with disabilities?Increasing font size
    Adjusting screen resolution
    Magnifying the display
    Adjusting colour contrasts
    Using sound output rather than visual
    Keywords to describe graphics
  8. 8Choosing type of monitor or screen,what should be considered?Kind of image to be viewed
    Where to be viewed
    Who to view
    Internet access
  9. 9Choosing type of printer,what should be considered?What is to be printed
    How many documents
    What kind of media
    Who is to use it
  10. 10Reasons to store dataBasic setup information and OS are required for computer to function
    Application software needs to be available to carry out tasks
    Files need to be stored so they can be used again
    Data may need to be transferred
    Backup copies need to be taken
  11. 11What is file compression?It allows file sizes to be made smaller. It can reduce transmission time or allows more data to be fitted on to any storage medium.
  12. 12What are the types of storage?Magnetic storage
    Hard Disks
    Floppy Disks
    Optical storage
    Flash memory
    Online storage (cloud)
  13. 13What is important to think about when using removable storage?Volume of data to be stored
    Reason why data is being stored
    Whether data will need to be rewritten
    Speed of recovery
    Physical size of device
  14. 14What is the role of the OS?Manages memory when computer is carrying out more than one task
    Allocates processor time
    Controls where data is stored
    Communicates with input and output devices
    Handles errors
    System security,user and file permissions
  15. 15What are the different types of application software?Text
    Number
    Picture
    Video
    Sound
    Multimedia
  16. 16What is included in a H&S risk assessment?Identify the hazards the user is exposed to
    Identify the risks the hazard can produce
    Put safety precautions in place
    Train workers to deal with any risks left
    Check situation regularly to make sure it hasn't become worse
    Encourage staff to report any h&s problems
  17. 17What are the four risks in the display screen equipment regulations?Back pain
    RSI
    Eye strain
    Stress
  18. 18How can risks associated with back pain be reduced?Adjustable chairs
    Adjustable monitors
    Adjustable keyboard
    Enough work space for documents
    Regular breaks
  19. 19What is a perfect workstation?What is a perfect workstation?
  20. 20How can risks associated with RSI be reduced?Ensure workstation and chair are correct height
    Use wrist rests
    Keep elbows close to sides
    Regular breaks
  21. 21How can risks associated with eye strain be reduced?Monitors that dont flicker
    Blinds at windows
    Suitable lighting
    Screen filter
    Regularly look away from screen and focus on something else
    Regular breaks
    Regular eye tests
  22. 22How can risks associated with stress be reduced?Regular communication between staff and managers
    Training schemes
    Checking of staffs workload
    Have relaxed time at home
    Tell boss if feeling under pressure
    Ask for help
  23. 23How can software design improve health and safety?Background and font colours/sizes shouldn't cause eye strain
    Logical menu layouts to reduce RSI
    Interaction controls and screen icons
    Keyboard shortcuts
    Macros to reduce key presses
    Accept input from a variety of devices
    Help options
  24. 24What is involved with the analysis stage of SDLC?Identifying problems
    Identifying client requirements
    Identifying input,processing,output
  25. 25How could you identify client requirements?Interview
    Questionnaire
    Existing paperwork
    Observations
  26. 26What would you find out from the current system?How users interact with current system
    How other systems interact with current system
    What is good about current system
    What causes problems in current system
    Which parts of system are critical to business
  27. 27What do you say about the proposed new system?What the new system is expected to do
    How the new system is expected to do this
    What people want from the new system
    Which parts of the old system should be incorporated into the new system
  28. 28What 3 type of diagrams would be used to show results from analysis stage?System diagrams
    Data flow diagrams
    Process diagrams
  29. 29What is involved in the design stage of the SDLC?Project planning
    System requirements specification
    Data dictionary
    Testing documentation
    Prototyping
  30. 30What is project planning?Project planning is about handling people;how many,where and when they are needed. in addition these people will need resources to carry out their jobs.
  31. 31What is included in the system requirements specification?Data capture methods for the system
    Data inputs to system
    Data outputs from system
    Data processing
    File structure for data storage
  32. 32What is the data dictionary?It defines:
    tables,fields,records and relationships
    constants,variables and data structures
    validation that is required
    query structures
  33. 33What is included in the testing documentation?A test plan is written at this stage to test the key parts of the system once it has been developed.
  34. 34What is prototyping?A prototype is something that represents what you will finally create without having to worry about all the details.
  35. 35What is developed in the implementation stage?Table and data structure
    Validation routines
    Data capture forms
    Data input forms
    Automated processing routines
    Queries
    User interface
    Printing outputs
  36. 36What is a beta tester?A tester who tests the system against the client requirements and makes sure it follows everything in the system spec.
  37. 37What is an alpha tester?An alpha tester makes sure the system is user friendly,they have had no involvement in the development of the system.
  38. 38What is the role of the test plan?The beta testers use this to test all parts of the system. They use this exactly ,entering all data specified on the plan.
  39. 39What three types of data should be tested?Normal data
    Extreme data
    Erroneous data
  40. 40What are the 4 different types of installation?Direct
    Parallel
    Phased
    Pilot
  41. 41What is the direct method of installation?This is where the company switches off the old system and switches on the new one.
  42. 42What is the parallel method of installation?This runs both systems at the same time. Once the organisation is sure that the new system is working properly they will make the decision to fully change over.
  43. 43What is the phased method of installation?This is where the old system is in place but parts of the new system are brought online. Once any problems have been corrected with these parts of the new system more parts will be added.
  44. 44What is the pilot method of installation?This is where the complete new system is tested out in certain departments or branches.
  45. 45What is another essential part of the installation stage?Staff training
  46. 46What 4 questions should be asked at the evaluation stage?Does the solution do what it is supposed to?
    Does it do it in the way it was supposed to?
    Is the solution an effective one?
    If not,what would make the solution an effection one?
  47. 47What are the 3 types of maintenance?Corrective
    Adaptive
    Perfective
  48. 48What is corrective maintenance?This is where problems are identified with system after installation. This is then corrected by the team and retested to make sure the problem is solved.
  49. 49What is adaptive maintenance?This happens due to external changes or strategic changes in the company. e.g. VAT rate
  50. 50What is perfective maintenance?Over time,the user will find small tweaks or changes that will help improve the systems running. The system stays running while these changes are being made.

Informationen

Beschreibung
A-Level ICT (Unit 1) Karteikarten am ICT Unit 1 flashcards, erstellt von sophiegreer3 am 22/04/2015.
Erstellt von
sophiegreer3
Aufrufe
43
Bewertung
Durchschnittliche Bewertung 5,0 von 5 (1 Bewertung)

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck