Project Management (PID)

Sana Ayub Computing A level Englisch 34 Karten

Karten in diesem Stapel (34)

  1. 1What are assumptions and list one example?Include a minimum of 4
    An assumption is a condition you think to be true, and a constraint is a limitation on your project. Assumptions need to be analysed
    One example is "An estimated 2.5TB of data will be generated by the new building project"
  2. 2What are the constraints and list one example?Include a minimum of 3
    A constraint is a limitation on your project. Constraints need to be identified.
    One example of a constraint is "The project will start on 17th Sept 2019"
    Another example is "There is a budget of £25,500 for the project"
  3. 3What are risks and list one example?Include a minimum of 6
    An uncertain event or condition that, if it occurs, has a positive or negative effect on a project’s objectives.
    An example is "The changeover fails and results in the upgraded system not being ready for handover"
  4. 4What are the key assumption categories?Human Resource Availability, Budget Availability, Scheduling accuracy, Performance of contractors, suppliers and vendors, Achievable success criteria, Upper Management Support
  5. 5Human Resource AvailabilityAll key project team members are available and have the necessary skills and knowledge to work on the project.
  6. 6Budget AvailabilityThe determined budget is accurate and covers all project expenses.
  7. 7Key Risk Categories (Scope Risks)Scope creep
    Integration issues
    Change in dependencies
  8. 8Key Risk Categories (Scheduling Accuracy)Unexpected delays at an external vendor
    Errors in estimation
    Delays in acquisition of parts
  9. 9Key Risk Categories (Resource Risk)Project team doesn’t have skills needed
    Funding is inadequate
    Key members of project team leave or don’t complete work
  10. 10Key Risk Assumptions (Technology Risk)Software & hardware defects
    Failure of an underlying service or a platform
    Critical tool that no longer supports your fuctions
  11. 11What is a project deliverable?Include a minimum of 4
    A deliverable is a tangible or intangible good or service produced as a result of a project that is intended to be delivered to a customer.
  12. 12Examples?A document
    Equipment
    A product
    Software
    A result
    An approval
  13. 13Detailed example #1 Part 1Category: Documentation
    Item: Analysis & design documentation
    Components: Interfaces, Processes, Outputs, Storyboards
    Description: Analysis of the existing system, identifying customisations, and design of the upgraded system
  14. 14Part 2Item: Development documentation (category)
    Components: Data dictionaries, flowcharts, pseudocode
    Description: Record of the developed upgrade system to help support and maintain the system going foward
  15. 15Detailed example #22. Software & Hardware (category)
    New server and upgraded software
    Components: Check task brief for specifics
    New system
    Components: Check task brief for functions
  16. 16Detailed example #33. A result (category)
    Business goals from task brief must be specific!
    E.g. “Productivity savings of £2000 per annum”
    How will this be measured?
    E.g. “User time spent on system figures, Comparison of new and old user time figures”
  17. 17Detailed example #4Item: The company expects a substantial reduction in labour costs
    Components: Due to the new system monitoring and controlling the production lines
    Description: This will enable the company to be much more competitive, which will lead to an increase in sales
  18. 18Detailed example #5Item: A server for the new system
    Components: RDBMS, SQL software, RAID enabled Hard Disk Drive with large capacity
    Description: Cost of £940.
  19. 19Detailed example #6Item: Windows-based control system
    Components: inputs, processes, scripts and outputs such as reports
    Description: The upgrade to the control hardware will be offered at an introductory price of £4,500. The control software will be provided free of charge
  20. 20StakeholdersIndividuals and organizations who are actively involved in the project, or whose interests may be positively or negatively affected as a result of project execution or successful project completion
  21. 21Project SponsorBudget decisions
    Provides business context
    Escalation point for decisions and issues above PM
  22. 22ClientAgree project requirements
    Answer questions & give feedback
    Provide sign-off
    Recipient of deliverables at handover
  23. 23Scheduling AccuracyThe set deadlines and milestones are achievable and the project can be finished on time.
  24. 24Project ManagerPlan & monitor project progress
    Maintain scheduling documents
    Control time and budget
    Manage risks
    Provide comms
  25. 25Senior DeveloperLead product development
    Manage team of developers
    Review and improvise code
    Run tests and fix bugs
    Update PM with development progress
  26. 26Server ManagerInstall server hardware
    Update server software
    Provide support during system changeover
    Identify need hardware
  27. 27Consultant/ContractorComplete set task or phase of the project
    Provide expert advice
    Check task brief for specifics.
  28. 28End UsersProvide feedback on design
    Conduct end user/black box testing
  29. 29Types of communication with stakeholdersFace to face meetings
    Formal documentation
    Email
    Phone conversation
  30. 30Outcome of the communication with StakeholdersPID, Checkpoint report
  31. 31Frequency of communicationDaily, twice daily
    Bi-weekly
    Weekly
    At each milestone
    Monthly
    At start/end of project
  32. 32Performance of contractors, suppliers and vendorsAll necessary equipment and goods are available whenever you need them.
  33. 33Achievable success criteriaThe success criterias used to measure if the project achieved its objective are reasonable.
  34. 34Upper management supportYou have the support and buy-in from the client and the project sponsor, who will back you up when issues arise.

Informationen

Beschreibung
A level Computing Karteikarten am Project Management (PID), erstellt von Sana Ayub am 02/10/2020.
Erstellt von
Sana Ayub
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck