Waterfall Model

  1. Features

    • Sequence of distinct phases
    • 1 stage must be finished before moving onto a next phase
    • Deliverables at end of each stage used to ensure progress
    • If error is found during a stage then previous stages may need to be reworked
  2. Stages

    • Analysis
      • Help Systems Analyst define requirements
      • Questionnaire
      • Observation
      • Interview
      • Document Inspection
      • Discover the data, volume of data, information, users & roles, problems with current system
    • Design
      • Solution defined
      • Data to be processed specified
      • Input, Processes & Format of Output defined
      • Hardware & Software requirements
      • Testing strategies defined
    • Development & Testing
      • Unit Testing
        • Testing each field, button etc. for validation
        • Person who wrote code
      • Integration Testing
        • All code functions together
        • Construction Team
      • System Testing
        • Actual data if used in real situation
        • Under supervision of Systems Analyst
      • Types of Test Data
        • Extreme
          • On Boundary
        • Valid/ Normal
          • Within Boundaries
        • Exceptional
          • Doesn't follow rules but valid e.g. 29th February
        • Invalid/ Erroneous
          • Not Acceptable
    • Implementation
      • Parallel
        • Old & New side by side
        • Safer
        • More work
      • Phased
        • Part I complete before Part 2
        • Safer
        • Long
      • Direct
        • New system starts on set day
        • Faster
        • Stressful, No fall back
      • Pilot
        • Installed in one branch
        • Train other staff, identify problems
        • Takes Time
    • Review & Maintenance
      • Corrective
        • Small issues after installation
      • Adaptive
        • Due to external factors e.g. VAT change
      • Perfective
        • System in place for some time but some small tweaks identified

Informationen

Beschreibung
A Level ICT (Unit 3.3) Mindmap am Waterfall Model, erstellt von scott.dowle am 28/05/2013.
Erstellt von
scott.dowle
Aufrufe
253
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck