Mindmap
Soft Engineering Flood Management Schemes

Mind map: soft engineering flood management schemes
Inhalt der Mindmap
Soft Engineering Flood Management Schemes
Land use management
- Planning restrictions prevent buildiings or roads being constructed on the flood pain. More water can infiltrate so there is less surface runoff, which reduces discharge and flooding.
- Benefits- There are no new buildings or roads on the floodplain so flooding is reduced. Recreational opportunities are provided, e.g football fields.
- Drawbacks- It restricts development, which could lead to a housing shortage. This scheme also can't be applied if areas are already urbanised.
- Planning restrictions prevent buildiings or roads being constructed on the flood pain. More water can infiltrate so there is less surface runoff, which reduces discharge and flooding.
Wetland and river bank conservation
- They store flood water and also slow it down, which reduces flooding downstream. Planting trees and shrubs along the river bank increases interception and lag time, and reduces discharge.
- Benefits- Vegetation protects the surface soil from erosion, and the vegetation provides habitats for wildlife.
- Drawbacks- Less land is available for farming.
- They store flood water and also slow it down, which reduces flooding downstream. Planting trees and shrubs along the river bank increases interception and lag time, and reduces discharge.
River restoration
- Involves making he river more natural, e..g removing man- made levees, so the flood plain can flood naturally. As the water spreads out over the floodplain he river's discharge is reduces because less water is in the channel, reducing flooding downstream.
- Benefits- little maintenance is needed because the river is left in it's natural state, and there is a habitat for wildlife.
- Drawbacks- Local flood risk can increase, especially if nothing is done to prevent major flooding.
- Involves making he river more natural, e..g removing man- made levees, so the flood plain can flood naturally. As the water spreads out over the floodplain he river's discharge is reduces because less water is in the channel, reducing flooding downstream.
Alteration of urban surfaces
- Building porous surfaces or soakaways increases infiltration, which reduces rapid surface runoff to the river channel. This increases lag time, which reduces discharge and flooding.
- Drawbacks- It's expensive.
- Benefits- Any pollutants in the water are filtered out by the soil before water reaches the channel.
- Building porous surfaces or soakaways increases infiltration, which reduces rapid surface runoff to the river channel. This increases lag time, which reduces discharge and flooding.
Weather forecasts and flood warnings
- The Environment Agency monitors weather forecasts, rainfall and river discharge, and warn people about possible floods, mainly through the media.
- Benefits- People have time to plan for the flood and act accordingly.
- Drawbacks- Some people might not be able to access any information, whilst others may ignore them if they have been inaccurate in the past. There also may not be time to issue warnings if there is a flash flood.
- The Environment Agency monitors weather forecasts, rainfall and river discharge, and warn people about possible floods, mainly through the media.
Informationen
- Beschreibung
- AS Level AS Level (Geography) Mindmap am Soft Engineering Flood Management Schemes, erstellt von scarlettrosiex am 03/01/2015.
- Erstellt von
- scarlettrosiex
- Aufrufe
- 10
- Bewertung