Process: Develop Schedule Process Group: Plannning Knowledge Area: Time Managment
The process of analyzing activity sequences, durations, resource requirements and schedule constraints to create the project schedule model.
1.- Schedule managment plan
2.- Activity List
3.- Activity Attributes
4.- Project Schedule network Diagrams
5.- Activity resource requirements
6.- Resource calendars
7.- Activity duration estimates
8.- Project scope statement
9.- Risk register
10.- Project staff assignments
11.- Resorce breakdown structure
12.- Enterprise Enviromental Factors (EEF)
13.- Organizational Process Assets (OPA´S)
1.- Schedule network analysis
5.- Modeling Techniques
2.- Critical Path method
- Used to estimate the minium project duration , The critical path is the secuence of activities that represent the longest path through a project wich determines the shortestpossible project duration.
- A CPM critical path is normally charactterized by zero total float on the critical path
- Used to estimate the minium project duration , The critical path is the secuence of activities that represent the longest path through a project wich determines the shortestpossible project duration.
6.- Leads and lags
3.- Critical Chain method
7.- Schedule compression
4.- Resource optimization techniques
8.- Scheduling tool
1.- Schedule baseline
2.- Project Schedule
3.- Schedule data
4.- Project Calendars
5.- Project managment plan updates
6.- Project documents updates
The schedule is a calendar-base, approved, and realistic as it relates to all of the other activities and resourses that are needed to complete the work of the project
The schedule model cosists of all the project date tha will be used to calculate the schedule,such as the activities, dependencie, leads and lags,etc.
Once a network diagram and Activity duration estimates are completed, it is time to put the information into a schedule.
Projetc Evaluation Review Techique (PERT)estimate is an estimate of statistical- probabilistic type therefore uses concepts such as mean, variance and standard deviation.
- Formulas PERT
- Distrubución de probabilidad triangular: Te =(a+b+c)/3
- Distribución de probabilidad beta: Te=(a+4b+c)/6
- Calculo de varianza probabilistica: σ² = [(c-a)/6]2
- La estimación de tres puntos se basa en tres tipos de estimación: La Opimista (a) La mas comun (b) La pesimista (c)
- Formulas PERT
Bilder und Dateien der Mindmap
Informationen
- Beschreibung
- Mindmap am SAB6#56 Develop_Schedule, erstellt von Reyna Carbajal am 07/06/2015.
- Erstellt von
- Reyna Carbajal
- Aufrufe
- 13
- Bewertung