SAB6#56 Develop_Schedule

Reyna Carbajal Spanish

SAB6#56 Develop_Schedule

Map content

SAB6#56 Develop_Schedule

  1. Process: Develop Schedule Process Group: Plannning Knowledge Area: Time Managment

  2. The process of analyzing activity sequences, durations, resource requirements and schedule constraints to create the project schedule model.

  3. 1.- Schedule managment plan

  4. 2.- Activity List

  5. 3.- Activity Attributes

  6. 4.- Project Schedule network Diagrams

  7. 5.- Activity resource requirements

  8. 6.- Resource calendars

  9. 7.- Activity duration estimates

  10. 8.- Project scope statement

  11. 9.- Risk register

  12. 10.- Project staff assignments

  13. 11.- Resorce breakdown structure

  14. 12.- Enterprise Enviromental Factors (EEF)

  15. 13.- Organizational Process Assets (OPA´S)

  16. 1.- Schedule network analysis

  17. 5.- Modeling Techniques

  18. 2.- Critical Path method

    • Used to estimate the minium project duration , The critical path is the secuence of activities that represent the longest path through a project wich determines the shortestpossible project duration.
      • A CPM critical path is normally charactterized by zero total float on the critical path
  19. 6.- Leads and lags

  20. 3.- Critical Chain method

  21. 7.- Schedule compression

  22. 4.- Resource optimization techniques

  23. 8.- Scheduling tool

  24. 1.- Schedule baseline

  25. 2.- Project Schedule

  26. 3.- Schedule data

  27. 4.- Project Calendars

  28. 5.- Project managment plan updates

  29. 6.- Project documents updates

  30. The schedule is a calendar-base, approved, and realistic as it relates to all of the other activities and resourses that are needed to complete the work of the project

  31. The schedule model cosists of all the project date tha will be used to calculate the schedule,such as the activities, dependencie, leads and lags,etc.

  32. Once a network diagram and Activity duration estimates are completed, it is time to put the information into a schedule.

  33. Projetc Evaluation Review Techique (PERT)estimate is an estimate of statistical- probabilistic type therefore uses concepts such as mean, variance and standard deviation.

    • Formulas PERT
      • Distrubución de probabilidad triangular: Te =(a+b+c)/3
      • Distribución de probabilidad beta: Te=(a+4b+c)/6
      • Calculo de varianza probabilistica: σ² = [(c-a)/6]2
    • La estimación de tres puntos se basa en tres tipos de estimación: La Opimista (a) La mas comun (b) La pesimista (c)

Images and files in the map

  • SAB6#56 Develop_Schedule
  • SAB6#56 Develop_Schedule
  • SAB6#56 Develop_Schedule

Information

Description
Mind Map on SAB6#56 Develop_Schedule, created by Reyna Carbajal on 07/06/2015.
Created by
Reyna Carbajal
Views
13
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?