047_Controlling_Scope

Alejandro Becerra Taller PMP PMP Credential Spanisch

047_Controlling_Scope

Inhalt der Mindmap

047_Controlling_Scope

  1. I have to do if there is a change in project scope ?

  2. variance analysis.

    • This tool is the difference analysis between the baseline and the actual work, serves to determine if the plan needs to be corrected. If so, then recommended corrective action, and disseminate through the recommendation a change control
  3. The goal of Control Scope is updating the scope, plan, baseline, and WBS info

  4. This process will tell us if we are right or not, regarding the planned scope and if we are controlling the changes that appear in the project

Bilder und Dateien der Mindmap

  • 047_Controlling_Scope
  • 047_Controlling_Scope

Informationen

Beschreibung
PMP Credential Taller PMP Mindmap am 047_Controlling_Scope, erstellt von Alejandro Becerra am 27/02/2016.
Erstellt von
Alejandro Becerra
Aufrufe
0
Verlauf
  • Erstellt von Gerson Ramírez · 27 Feb 2016
  • Kopiert von Alejandro Becerra · 27 Feb 2016
Bewertung

Mehr zu Control Scope

Feedback

Worum geht es?

Was sollen wir als Nächstes hinzufügen?