  1. I have to do if there is a change in project scope ?

  2. variance analysis.

    • This tool is the difference analysis between the baseline and the actual work, serves to determine if the plan needs to be corrected. If so, then recommended corrective action, and disseminate through the recommendation a change control
  3. The goal of Control Scope is updating the scope, plan, baseline, and WBS info

  4. This process will tell us if we are right or not, regarding the planned scope and if we are controlling the changes that appear in the project

Imagens e arquivos do mapa

  • 047_Controlling_Scope
  • 047_Controlling_Scope

Informações

Descrição
PMP Credential Taller PMP Mapa Mental sobre 047_Controlling_Scope, criado por Alejandro Becerra em 27-02-2016.
Visualizações
0
Histórico
  • Criado por Gerson Ramírez · 27 fev 2016
  • Copiado por Alejandro Becerra · 27 fev 2016
Avaliação

Mais sobre Control Scope

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?