047_Controlling_Scope

Alejandro Becerra Taller PMP PMP Credential Spanish

047_Controlling_Scope

Map content

047_Controlling_Scope

  1. I have to do if there is a change in project scope ?

  2. variance analysis.

    • This tool is the difference analysis between the baseline and the actual work, serves to determine if the plan needs to be corrected. If so, then recommended corrective action, and disseminate through the recommendation a change control
  3. The goal of Control Scope is updating the scope, plan, baseline, and WBS info

  4. This process will tell us if we are right or not, regarding the planned scope and if we are controlling the changes that appear in the project

Images and files in the map

  • 047_Controlling_Scope
  • 047_Controlling_Scope

Information

Description
PMP Credential Taller PMP Mind Map on 047_Controlling_Scope, created by Alejandro Becerra on 27/02/2016.
Views
0
History
  • Created by Gerson Ramírez · Feb 27, 2016
  • Copied by Alejandro Becerra · Feb 27, 2016
Rating

More on Control Scope

Feedback

What is it about?

What should we add next?