SAB9#52_DEFINE ACTIVITIES (Modified)

Roman Velasquez Taller de Certificación PMI PMP Spanisch

Inhalt der Mindmap

SAB9#52_DEFINE ACTIVITIES (Modified)

  1. Schedule Management Plan

    • Tell us the methods to use.
  2. Scope Baseline

    • WBS, WBS Dictionary, PSS
  3. EEF´s

    • PMIS
  4. OPA´s

    • Lessons from similar projects.
  5. Activity List

    • Everything that needs to be done to complete the project. This list is lower-level than the WBS.
  6. Activity Attributes

    • Description of each activity. Information to figure out the order of the work. Constraints and information about resources.
  7. Milestone List

    • All of the important checkpoints of the project.
  8. Tools & Techniques To Define Activities

    • Decomposition
      • Take work packages and break them down into activities that can be estimated
    • Expert Judgment
      • Ask Someone with previous experience to give an opinion
    • Rolling Wave Planning
      • Decompose only activities needed to plan the coming up process. Everything else is left at the milestone level.
  9. PREGUNTA DE EXAMEN : Rolling Wave que es ? project Management Moderno , tu tienes un plan y que no necesariamente a cierto nivel todo esta definido (totalmente , parcialmente, nada) vas planeando en base a lo que tienes definido ( algunas se quedan como paquetes de trabajo) puedo hacer subplanes para empezar a ejecutar, es decir hacer tareas que no sean dependientes para avanzar por eso se estructura el proyecto en las cuentas de control.

Informationen

Beschreibung
PMP Taller de Certificación PMI Mindmap am SAB9#52_DEFINE ACTIVITIES (Modified), erstellt von Roman Velasquez am 21/04/2016.
Erstellt von
Roman Velasquez
Aufrufe
0
Verlauf
  • Erstellt von Pedro Torres Vega · 21 Apr 2016
  • Kopiert von Roman Velasquez · 21 Apr 2016
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck