SAB9#52_DEFINE ACTIVITIES (Modified)

Roman Velasquez Taller de Certificación PMI PMP Spanish

Map content

SAB9#52_DEFINE ACTIVITIES (Modified)

  1. Schedule Management Plan

    • Tell us the methods to use.
  2. Scope Baseline

    • WBS, WBS Dictionary, PSS
  3. EEF´s

    • PMIS
  4. OPA´s

    • Lessons from similar projects.
  5. Activity List

    • Everything that needs to be done to complete the project. This list is lower-level than the WBS.
  6. Activity Attributes

    • Description of each activity. Information to figure out the order of the work. Constraints and information about resources.
  7. Milestone List

    • All of the important checkpoints of the project.
  8. Tools & Techniques To Define Activities

    • Decomposition
      • Take work packages and break them down into activities that can be estimated
    • Expert Judgment
      • Ask Someone with previous experience to give an opinion
    • Rolling Wave Planning
      • Decompose only activities needed to plan the coming up process. Everything else is left at the milestone level.
  9. PREGUNTA DE EXAMEN : Rolling Wave que es ? project Management Moderno , tu tienes un plan y que no necesariamente a cierto nivel todo esta definido (totalmente , parcialmente, nada) vas planeando en base a lo que tienes definido ( algunas se quedan como paquetes de trabajo) puedo hacer subplanes para empezar a ejecutar, es decir hacer tareas que no sean dependientes para avanzar por eso se estructura el proyecto en las cuentas de control.

Information

Description
PMP Taller de Certificación PMI Mind Map on SAB9#52_DEFINE ACTIVITIES (Modified), created by Roman Velasquez on 21/04/2016.
Created by
Roman Velasquez
Views
0
History
  • Created by Pedro Torres Vega · Apr 21, 2016
  • Copied by Roman Velasquez · Apr 21, 2016
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?