SAB9#52_DEFINE ACTIVITIES (Modified)
Map content
SAB9#52_DEFINE ACTIVITIES (Modified)
Schedule Management Plan
- Tell us the methods to use.
Scope Baseline
- WBS, WBS Dictionary, PSS
EEF´s
- PMIS
OPA´s
- Lessons from similar projects.
Activity List
- Everything that needs to be done to complete the project. This list is lower-level than the WBS.
Activity Attributes
- Description of each activity. Information to figure out the order of the work. Constraints and information about resources.
Milestone List
- All of the important checkpoints of the project.
Tools & Techniques To Define Activities
- Decomposition
- Take work packages and break them down into activities that can be estimated
- Expert Judgment
- Ask Someone with previous experience to give an opinion
- Rolling Wave Planning
- Decompose only activities needed to plan the coming up process. Everything else is left at the milestone level.
- Decomposition
PREGUNTA DE EXAMEN : Rolling Wave que es ? project Management Moderno , tu tienes un plan y que no necesariamente a cierto nivel todo esta definido (totalmente , parcialmente, nada) vas planeando en base a lo que tienes definido ( algunas se quedan como paquetes de trabajo) puedo hacer subplanes para empezar a ejecutar, es decir hacer tareas que no sean dependientes para avanzar por eso se estructura el proyecto en las cuentas de control.
Information
- Description
- PMP Taller de Certificación PMI Mind Map on SAB9#52_DEFINE ACTIVITIES (Modified), created by Roman Velasquez on 21/04/2016.
- Created by
- Roman Velasquez
- Views
- 0
- History
-
- Created by Pedro Torres Vega · Apr 21, 2016
- Copied by Roman Velasquez · Apr 21, 2016
- Rating