GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

Scheduling Resources & Cost

M Girod Englisch

Inhalt der Mindmap

Scheduling Resources & Cost

  1. Problems

    • Technical Constraints
    • Resource Constraints
      • People
      • Equipment
      • Materials
    • Resource Smoothing
      • Leveling
    • Physical Constraints
  2. Classification Scheduling Problem

    • Time Constraints Project
      • Imposed Dates
      • Time Fix
    • Resource Constraints Project
      • Level of Resources
        • Resource Fix
  3. Resource Allocation Methods

    • Assumptions
      • Limited
        • Splitting Activities
      • Resource Level
        • Can't be Changed
    • Time Constrainted Project
      • Smoothing Resource Demand
        • Utilization
          • Leveling
            • Delay Noncritical Activities
              • Demand Reduce
              • Resources Reduce
              • Fluctuation Minimized
    • Resource Constrained Project
      • Lack of
        • People
        • Equipment
      • Prioritize & Allocate
        • Minimize Delay
      • Heuristics
        • Prioritize Rule
          • Minimum Slack
          • Smallest Duration
          • Lowest ID #
        • Parallel Method
  4. Computer Program

    • MS Project
      • Resource Constrain Scheduling
        • Leveling Tool
          • Reduce Slack
          • Reduce Flexibility
          • Minimize Delay
        • Increase Criticality Events
        • Increase Scheduling Complexity
        • Critical Path Meaningless
        • Break Sequence
        • Parallel Activities Sequential
        • Activities w/Slack Become Critical
  5. Splitting Activities

    • Scheduling Technique
      • Low
        • Start up cost
        • Shut Down Cost
    • Can cause Project failure
    • Resource Utilization
  6. Benefit

    • Limit
      • Resources
        • Fail to
          • Schedule
  7. Assigning

    • Use Best People
    • Team Up
      • Less Experience Poeple
      • Habits & Personalities
  8. Multi Project

    • Common Problem
      • Overall Schedule Slippage
      • Inefficient Resource Utilization
      • Resource Bottleneck
    • Demand
    • Reconciled
    • Dynamic
    • Capable
    • Create Department
      • Project Priorty
    • Centralize Management
  9. Resource Scheduling

    • Time-Phased Budget Baseline
      • Time
        • Under, on, Over
      • Budget Cost
        • Under, On, Over
      • Time Phased Budget
        • Assign each package
          • Responsible Person
          • Department

Informationen

Beschreibung
Mindmap am Scheduling Resources & Cost, erstellt von M Girod am 28/10/2018.
Erstellt von
M Girod
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck