Scheduling Resources & Cost
Problems
- Technical Constraints
- Resource Constraints
- People
- Equipment
- Materials
- Resource Smoothing
- Leveling
- Physical Constraints
Classification Scheduling Problem
- Time Constraints Project
- Imposed Dates
- Time Fix
- Resource Constraints Project
- Level of Resources
- Resource Fix
- Level of Resources
- Time Constraints Project
Resource Allocation Methods
- Assumptions
- Limited
- Splitting Activities
- Resource Level
- Can't be Changed
- Limited
- Time Constrainted Project
- Smoothing Resource Demand
- Utilization
- Leveling
- Delay Noncritical Activities
- Demand Reduce
- Resources Reduce
- Fluctuation Minimized
- Delay Noncritical Activities
- Leveling
- Utilization
- Smoothing Resource Demand
- Resource Constrained Project
- Lack of
- People
- Equipment
- Prioritize & Allocate
- Minimize Delay
- Heuristics
- Prioritize Rule
- Minimum Slack
- Smallest Duration
- Lowest ID #
- Parallel Method
- Prioritize Rule
- Lack of
- Assumptions
Computer Program
- MS Project
- Resource Constrain Scheduling
- Leveling Tool
- Reduce Slack
- Reduce Flexibility
- Minimize Delay
- Increase Criticality Events
- Increase Scheduling Complexity
- Critical Path Meaningless
- Break Sequence
- Parallel Activities Sequential
- Activities w/Slack Become Critical
- Leveling Tool
- Resource Constrain Scheduling
- MS Project
Splitting Activities
- Scheduling Technique
- Low
- Start up cost
- Shut Down Cost
- Low
- Can cause Project failure
- Resource Utilization
- Scheduling Technique
Benefit
- Limit
- Resources
- Fail to
- Schedule
- Fail to
- Resources
- Limit
Assigning
- Use Best People
- Team Up
- Less Experience Poeple
- Habits & Personalities
Multi Project
- Common Problem
- Overall Schedule Slippage
- Inefficient Resource Utilization
- Resource Bottleneck
- Demand
- Reconciled
- Dynamic
- Capable
- Create Department
- Project Priorty
- Centralize Management
- Common Problem
Resource Scheduling
- Time-Phased Budget Baseline
- Time
- Under, on, Over
- Budget Cost
- Under, On, Over
- Time Phased Budget
- Assign each package
- Responsible Person
- Department
- Assign each package
- Time
- Time-Phased Budget Baseline