Bored Piles Construction

  1. Size can be varied

    • Suits different ground conditions
    • Allows for stronger foundations
  2. High cost (compared to driven piles)

    • More material needed
    • More wastage to get rid of
  3. Defects can occur during construction

    • Cracking leads to weaker pile strength
    • Costly to Replace
  4. Suitable for Urban Conctruction

    • Lower noise - less effect on surrounding buildings
    • Less vibration - less effect on surrounding buildings
  5. Construction can be completed quickly

    • Machinery is mobile and can be moved quickly to bore holes
      • More holes can then be poured at a time.
  6. Soil can be tested before construction

    • Allows suitability of construction method to be assessed.

Informationen

Beschreibung
Fourth Year Quantity Surveying (Advanced Construction Management) Mindmap am Bored Piles Construction, erstellt von mdunn7200 am 26/04/2016.
Erstellt von
mdunn7200
Aufrufe
2
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck