Bored Piles Construction

mdunn7200 Quantity Surveying Fourth Year Inglés

Contenido del mapa

Bored Piles Construction

  1. Size can be varied

    • Suits different ground conditions
    • Allows for stronger foundations
  2. High cost (compared to driven piles)

    • More material needed
    • More wastage to get rid of
  3. Defects can occur during construction

    • Cracking leads to weaker pile strength
    • Costly to Replace
  4. Suitable for Urban Conctruction

    • Lower noise - less effect on surrounding buildings
    • Less vibration - less effect on surrounding buildings
  5. Construction can be completed quickly

    • Machinery is mobile and can be moved quickly to bore holes
      • More holes can then be poured at a time.
  6. Soil can be tested before construction

    • Allows suitability of construction method to be assessed.

Información

Descripción
Fourth Year (Advanced Construction Management) Quantity Surveying Mapa Mental sobre Bored Piles Construction, creado por mdunn7200 el 26/04/2016.
Creado por
mdunn7200
Visitas
2
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?