Power Saving Program
- Decrease the Auxiliary Power
- Full Load
- Partial Load
- Decrease the Auxiliary Power
Making BTG Operator a Key Player for Efficiency Improvement
- Condenser pressure
- Reheat temperature
- Hot well temperature
- Reheat spray flow
- Exit Gas Temperature
- Incomplete Combustion
- Throttle pressure
- Super heat temperature
- Feed water temperature
- Super heat spray flow
- Station service power
- Excess oxygen
Decrease the Loses
- Mechanical
- Leak Control
- Internal Leak (Passing)
- Category 1
- Boiler (i.e., superheater header drains, reheat header drains, etc.)
- Turbine cycle drains (i.e., stop valve above and below seat drains, turbine loop line drains, trap on extraction piping, etc.)
- Category 2
- High pressure feedwater heater drains, Low pressure feedwater heater drains, Boiler feedwater pump minimum flow recirculation valves, Attemperation valves, etc.
- Category 1
- External Leak
- Category 3
- include all steam trap in the plant
- Category 4
- include all safety valves (steam or water)
- Category 3
- Internal Leak (Passing)
- Leak Control
- Electrical
- Monthly report for all photo cell
- Controlling the electrical power of Offices Lighting, controlling the HVAC temperature in night and holidays
- Check the losses through transformer by Losses Test
- Mechanical
Controlling the Startup & Shutdown Time
- Cold Startup
- Worm Startup
- Hot Startup
- Very Hot Startup
- Shutdown
Control Boiler BlowDown
- Chemical Injection Optimization
Efficiency Measurements
- Performance Test
- Cycle Circulation Test
Informationen
- Beschreibung
- Performance Team Saudi Electricity Company Mind Map
- Erstellt von
- Muhammed Al-Masmoum · Jun 2016
- Aktualisiert
- 7 Mär 2018
- Aufrufe
- 18
- Tags