  1. Gantt Chart

    • Chart showing tasks as blocks with the length of the block representing the duration of the task
    • Dependencies (tasks with must take place before another can be started) are represented by arrows
  2. Critical Path Analysis

    • Critical Path: The tasks depending on each other that determine the shortest time the project can be completed.
      • A delay in any task on the critical path creates a delay in the overall project time
    • CPA diagrams have labelled arrows representing tasks with the numbers representing duration.
      • Each task goes to and from a milestone, (multiple tasks can go to and from the same milestone)
    • Note: When drawing CPA diagrams it is best to work from the final task and add dependencies.
  3. Used to help plan and manage a project

  4. Focus on timescales as well as dependencies of tasks

Informationen

Beschreibung
A level, A2 IT (Chapter 1) Mindmap am 1f Gantt Chart and CPA, erstellt von Gladys Mba am 02/05/2017.
Erstellt von
Gladys Mba
Aufrufe
4
Bewertung

Mehr zu Project Scheduling and Network Analysis

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck