GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Quiz

2 Introduction

Alex C 28 Fragen

Quiz starten

Fragen in diesem Quiz (28)

  1. 1(Select 4) Why is software special?
    1. AIt is abstract, invisible, intangible.
    2. BIt never wears out.
    3. CIt is changing all the time.
    4. DIt is not manufactured in the classical sense.
    5. EIt is manufactured using the same technologies used for other engineering artifacts.
  2. 2(Select 2) Which of the following are recognized process flow types?
    1. AConcurrent process flow
    2. BIterative process flow
    3. CLinear process flow
    4. DSpiral process flow
  3. 3Software processes can be constructed out of pre-existing software patterns to best meet the needs of a software project.
    1. ARichtig
    2. BFalsch
  4. 4(Select 2) Which of these are standards for assessing software processes?
    1. ASEI
    2. BSPICE
    3. CISO 9000
    4. DISO 9001
  5. 5The waterfall model of software development is
    1. AA reasonable approach when requirements are well defined.
    2. BA good approach when a working program is required quickly.
    3. CThe best approach to use for projects with large development teams.
    4. DAn old fashioned model that is rarely used any more.
  6. 6The incremental model of software development is
    1. AA reasonable approach when requirements are well defined.
    2. BA good approach when a working core product is required quickly.
    3. CThe best approach to use for projects with large development teams.
    4. DA revolutionary model that is not used for commercial products.
  7. 7(Select 3) Evolutionary software process models
    1. AAre iterative in nature
    2. BCan easily accommodate product requirements changes
    3. CDo not generally produce throwaway systems
    4. DBuild from the top down
  8. 8The prototyping model of software development is
    1. AA reasonable approach when requirements are well defined.
    2. BA useful approach when a customer cannot define requirements clearly.
    3. CThe best approach to use for projects with large development teams.
    4. DA risky model that rarely produces a meaningful product.
  9. 9The spiral model of software development
    1. AEnds with the delivery of the software product
    2. BIs more chaotic than the incremental model
    3. CIncludes project risks evaluation during each iteration
    4. DAll of the above
  10. 10(Select 2) The concurrent development model is
    1. AAnother name for concurrent engineering.
    2. BDefines events that trigger engineering activity state transitions.
    3. COnly used for development of parallel or distributed systems.
    4. DUsed whenever a large number of change requests are anticipated.

Informationen

Beschreibung
SE Ch 2 study guide
Autor
Alex C
Sprache
English
Aufrufe
44
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck