GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Folien

Slides|Lesson 2: Quality Management and Coordination

Molly Vaughan Architecture ARE Englisch 9 Folien

Folien in diesem Satz (9)

  1. Determining Code Compliance

    • Construction Documents
    • Use group classification
    • Height and area - limitations based on use group
    • Construction Type - building materials used and fire resistance rating of the building elements
    • Siting - location of building on the site, including distance from lot lines and adjacent buildings
    • Fire performance
    • Interior environment and design - compliance with special use and occupancy requirements, means of egress, accessibility, and interior environment requirements
    • Exterior envelope - envelope requirements and energy conservation requirements
    • Structural Performance - structural compliance and building material requirements
    • Building service system
  2. CHECKING DRAWINGS

  3. Site Plan

    • Is there proper acccess to streets?
    • Are building separations adequate according to fire code resistance ratings?
  4. Plan and Sections

    • Verify that ceilling hieghts are permissible. Check heights of habitable spaces below grade
    • Verify that the height of the building is within allowable limits
    • Verify that the floor area of each floor is within permissible limits
    • Verify fire resistance of all building components
  5. Plans, Sections, Elevations

    • Verify that openings are protected where they are exposed to property lines, adjacent buildings, interior courts, or other openings in the same wall, above and below
  6. Plans and Sections: Egress

    • Confirm the number of occupants anticipated to occupy each floor of a building.
    • Verify the correct number, width, and arrangements of exits
    • Verify that distances to exits are within allowable limits
    • Verify that required exit door hardware is specified
    • Confirm the adequacy of aisles, corridors, and horizontal exits
    • Check that all stairways are properly located and enclosed, and that they provide a legal means of egress
  7. Plans

    • Verify that different occupancy types are separated by properly rated fire walls, etc
    • Verify that elevator, escalator, and vertical shaft enclosures are properly fire rated
  8. Specifications

    • Determine that finishes and trim meet requirements for proper classifications
    • Installation methods must meet code equirements for control of smoke emission and limitations of smoke toxicity
  9. Miscellaneous

    • Verify that roof coverings have required ratings

Informationen

Beschreibung
Ballast Construction Documents and Services Lesson Two Study Guide
Erstellt von
Molly Vaughan
Aufrufe
38
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck