GoConqr has a new look! Let us know what you think.

Quiz

Scrum Developer

B O 30 questions 1,706 views

Take the quiz

Questions in this quiz (30)

  1. 1What is pair programming?
    1. AThe Scrum Team is divided into several two-person Development Teams that consolidate work in a Scrum of Scrums.
    2. BA developer and a tester work together to write and test code.
    3. CTwo programmers write code separately. A third programmer integrates the work.
    4. DManagers doing performance reviews by comparing one programmer's code to another's.
    5. ETwo developers writing code together, providing constant peer review.
  2. 2Which are benefits of Test Driven Development?
    1. AIt improves quality and reduces bugs.
    2. BWhich are benefits of Test Driven Development
    3. CIt speeds the overall development process.
    4. DIt promotes good design and separation of concerns.
  3. 3You are on a Scrum Team that is enhancing an existing product. Which is the LEAST useful piece of documentation you want to have at your disposal?
    1. AWell-structured and named code.
    2. BDetailed designs.
    3. CThe full history of retrospective plans and lessons learned.
    4. DAcceptance tests.
  4. 4Which describes the practice of expressing requirements as acceptance tests?
    1. AAcceptance Test Driven Development
    2. BObject Driven Requirements Definition
    3. CQuality Oriented Requirements Definition
    4. DRegression Testing
  5. 5What is code coverage?
    1. AThe number of developers that understand how the code works.
    2. BThe percent of code in version control included in a build.
    3. CAn insurance policy that covers the code for defects.
    4. DThe degree to which the system under test has been exercised by tests.
  6. 6When is a system's architecture decided?
    1. AWhenever the assigned architect can join the Development Team.
    2. BIt is designed along with the vision, before the first Sprint.
    3. CIn the beginning of the project, during Sprint 0, when the groundwork is done.
    4. DThroughout the project, as understanding emerges and the Development Team learns more about the project.
  7. 7What happens during Sprint 0?
    1. ARequirements gathering, version control setup, and continuous integration setup.
    2. BOverall planning, base system architecture, base design, version control and continuous integration setup.
    3. CThere is no such thing as Sprint 0.
    4. DBase system architecture and design.
    5. EEstablish base system architecture and design, install version control and continuous integration setup.
  8. 8What is test first development?
    1. ADesigning tests before satisfying them.
    2. BHaving the tester in the Development Team write the test plans before coding.
    3. CTesting existing code before adding more code to it.
    4. DThe continuous restructuring of software to retain flexibility.
  9. 9Which are attributes of a good bug report (choose all that apply)?
    1. ASimple and repeatable reproduction steps.
    2. BBuild or version where bug was found.
    3. CScreenshots or other pictures of bug in action when user interfaces are involved.
    4. DClear title and proper grammar in report.
    5. EExpected results and observed results.
    6. FOne bug per report.
  10. 10When are testers and quality experts ideally included in a project?
    1. AFrom the beginning and throughout all Sprints
    2. BAfter Sprint Review
    3. CWhen the product is feature complete
    4. DAfter developer handoff

Information

Description
A Quiz for Scrum developers
Author
B O
Language
Deutsch
Views
1,706
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?