IRATA Level 1 Hazards and method statements: knowledge check questions

Site-specific risk assessment, controls with PPE last, pre-work analysis and safety method statements.

44 questions · 21 key rules

Updated 18 November 2026 from IRATA's current published documents

Sample questions

Tap a question to see the answer and the rule behind it.
  1. Hazards and method statements1. A technician checks the device fitted to their safety line. Which device is intended to respond to a sudden load on that line?
    1. A back-up device
    2. An ascending device
    3. An anchor lanyard
    4. An anchor sling
    Show answer and explanation

    Answer: A. A back-up device

    A back-up device is used on a safety line and responds to a sudden load by locking or allowing only gradual movement. Practical training with an IRATA-approved provider is required.

    Why the others are wrong

    • An ascending device: An ascending device primarily assists progression and positioning on an anchor line.
    • An anchor lanyard: An anchor lanyard connects the harness to an anchor point.
    • An anchor sling: An anchor sling provides an anchor point using a structure or natural feature.

    Source: IRATA International Code of Practice for Industrial Rope Access, TC-102ENG, 1.3 Terms and definitions

  2. Hazards and method statements2. A technician identifies a particular place on a structure where an anchor device can be attached. What is that place called?
    1. An anchorage point
    2. An anchor line
    3. An anchor sling
    4. An anchor lanyard
    Show answer and explanation

    Answer: A. An anchorage point

    An anchorage point is the particular place on an anchorage used to attach an anchor device. Distinguishing the place from the equipment helps when discussing the setup.

    Why the others are wrong

    • An anchor line: An anchor line is a flexible line connected to a reliable anchor.
    • An anchor sling: An anchor sling is equipment used to provide an anchor point.
    • An anchor lanyard: An anchor lanyard connects the harness to an anchor point.

    Source: IRATA International Code of Practice for Industrial Rope Access, TC-102ENG, 1.3 Terms and definitions

  3. Hazards and method statements3. A site manager needs to designate a competent person for a task. What should that person have?
    1. Suitable training or qualifications based on knowledge and practical experience
    2. A certificate for the supplied equipment
    3. Experience of supervising any construction work
    4. Knowledge of the task without practical experience
    Show answer and explanation

    Answer: A. Suitable training or qualifications based on knowledge and practical experience

    A competent person must be suitably trained or qualified through knowledge and practical experience for the required task. This supports proper performance of that task. Training with an IRATA-approved provider is required.

    Why the others are wrong

    • A certificate for the supplied equipment: An equipment certificate does not establish a person's competence.
    • Experience of supervising any construction work: General supervision experience alone does not establish competence for the task.
    • Knowledge of the task without practical experience: The definition includes practical experience as well as knowledge.

    Source: IRATA International Code of Practice for Industrial Rope Access, TC-102ENG, 1.3 Terms and definitions

  4. Hazards and method statements4. A technician discusses what should happen if a critical part of a system fails. What does ‘fail to safe’ mean?
    1. Stop work only after the fault has been inspected
    2. Revert to a safe condition after the failure
    3. Continue operating until the load can be removed
    4. Warn the user while continuing normal operation
    Show answer and explanation

    Answer: B. Revert to a safe condition after the failure

    Fail to safe means reverting to a safe condition following a critical breakdown, failure or mismanagement. It describes the resulting condition, not just a warning or an inspection.

    Why the others are wrong

    • Stop work only after the fault has been inspected: An inspection is not the same as reverting to a safe condition.
    • Continue operating until the load can be removed: Continuing to operate is not what fail to safe means.
    • Warn the user while continuing normal operation: A warning alone does not establish a safe condition.

    Source: IRATA International Code of Practice for Industrial Rope Access, TC-102ENG, 1.3 Terms and definitions

  5. Hazards and method statements5. A potential fall is 3 metres, and 2 metres of rope is available to arrest it. What is the fall factor?
    1. 0.5
    2. 1.5
    3. 2.0
    4. 6.0
    Show answer and explanation

    Answer: B. 1.5

    Fall factor is the potential fall length divided by the rope length available to arrest it: 3 ÷ 2 = 1.5. The length available to arrest the fall therefore matters in the calculation.

    Why the others are wrong

    • 0.5: This is not the result of dividing 3 by 2.
    • 2.0: This uses the available rope length as the factor rather than calculating the ratio.
    • 6.0: This multiplies the lengths rather than dividing them.

    Source: IRATA International Code of Practice for Industrial Rope Access, TC-102ENG, 1.3 Terms and definitions

Sign up free

Other IRATA Level 1 topics

GoConqr Original. Practice questions written with AI from IRATA's free TACS and ICOP documents, each checked against the section it cites. Think a question is wrong? Use "Report" under it. Rope access is life-critical: these questions do not replace training from an IRATA-approved provider.

Independent revision resource. Not affiliated with IRATA or any training provider.

© Visual Maths Resources Ltd

Feedback

What is it about?