GoConqr has a new look! Let us know what you think.

Quiz

Dynamics AX product and BOM configuration questions

gabriela.deseusa 91 questions

Take the quiz

Questions in this quiz (91)

  1. 1You create a new product and a new bill of materials (BOM) for the product. The product is available in three different configurations.
    Which statement about these configurations is true?
    1. AA. The product configurator will create three separate configuration models
    2. BB. The product has different item numbers for each configuration.
    3. CC. All three configurations must have the same item number, but each configuration must
      have a unique configuration number.
    4. DD. Each configuration must have a unique item number and the item type must be set to
      BOM for each new product.
  2. 2You send a sales quotation to a customer named Contoso, Ltd. You have another customer named Litware, Inc. Litware has a trade agreement in place, which includes two of the items in the sales quotation that was sent to Contoso. You plan to copy the sales quotation to create a sales quotation for Litware. You need to ensure that the sales quotation for Litware adheres to the trade agreement you have with Litware. Which option should you select in the copy quotation function?
    1. AA. Copy precisely
    2. BB. Recalculate price
    3. CC. Copy charges
    4. DD. Delete quotation lines
  3. 3A customer reports a defective product. You need to find the vendors and the other customers who are affected by the defective product. Which three details are required before you can perform a trace?
    1. AA. The storage dimensions
    2. BB. The tracking dimensions
    3. CC. The item number
    4. DD. The trace direction
    5. EE. The transaction dates
  4. 4You plan to set up a commission structure in Dynamics AX.
    You need to configure the groups for commission calculations.
    Which three types of groups should you configure? Each correct answer presents part of
    the solution.
    1. AA. Item groups
    2. BB. Commission customer groups
    3. CC. Sales groups
    4. DD. Item discount groups
    5. EE. Campaign groups
  5. 5You need to establish picking routes.
    Which two types of information do you need? Each correct answer presents part of the
    solution.
    1. AA. The height of the locations
    2. BB. The proximity of the outbound dock
    3. CC. The direction in which to travel through the warehouse
    4. DD. The number of aisles
  6. 6Which two statements describe a requirements explosion from a sales order line?
    1. AA. The explosion creates a sales order line for each component of a bill of materials
      (BOM).
    2. BB. The explosion shows how requirements can be satisfied for the sales order line
    3. CC. The explosion is a partial update of the dynamic master plan
    4. DD. The explosion is used for the availability check.
  7. 7You create a new product that has a new bill of materials (BOM). The lines for each
    component are added to the BOM lines.
    You need to configure the BOM to prevent the line for item 700 and the line for item 500
    from both being selected in the BOM.
    What should you create?
    1. AA. Aconfiguration route for item 700 by using the Select method for 500
    2. BB. Aconfiguration rule for item 700 by using The Select method for 500
    3. CC. Aconfiguration route for item 700 by using the Deselect method for 500
    4. DD. Aconfiguration rule for item 700 by using the Deselect method for 500
  8. 8You plan to start using product change cases.
    You need to identify what must be configured before you can create a new product change
    case.
    What should you identify?
    1. AA. Case processes
    2. BB. Knowledge articles
    3. CC. Case workflows
    4. DD. Case categories
  9. 9You have several bills of materials (BOMs) that include an item manufactured by a third
    party.
    The third party plans to discontinue the production of the item.
    You need to locate all of the BOMs that include the item.
    Which report should you use?
    1. AA. Order lines
    2. BB. Where-used
    3. CC. Calculation
    4. DD. On-hand inventory
  10. 10You create a new sales order for an item that has a bill of materials (BOM) and a
    configuration.
    You select a new configuration for the item.
    You need the sales price on the sales order to reflect the options selected in the
    configuration of the BOM.
    What should you do?
    1. AA. Perform a components explosion on the line.
    2. BB. Select the correct sub-BOM on the line
    3. CC. Perform a requirement explosion on the line.
    4. DD. Perform a BOM calculation on the line.

Information

Description
Quiz on Untitled, created by gabriela.deseusa on 03/06/2015.
Language
Español
Views
4
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?