Test
Chapter 3 - CTFL ISTQB
Preguntas del test (35)
1Which of the following is a correct definition of a review?
- AThe review is mostly a manual activity in which work products like requirements, code, and design are reviewed in order to find defects in them
- BThe review is an automated activity in which work products like requirements, code, and design are reviewed in order to find defects in them
- CThe review is an automated activity in which the code is reviewed in order to find warnings and errors in it
2Which of the following is correct?
- AReviews rely on the manual examination of work products while static analysis is tool-driven
- BStatic analysis relies on the manual examination of work products while reviews are tool-driven
- CBoth reviews and static analysis are tool-driven
3What is the difference between warning and errors in the code?
- ACode can run without solving errors, but it can't run without solving warnings
- BCode can run without solving warnings, but it can't run without solving errors
- CAll warnings and errors must be solved before running the code
4Which of the following is correct regarding static analysis?
1-Static analysis is an important part of security testing
2-Static analysis is used only in sequential lifecycle models
3-Static analysis is important for safety-critical computer systems- A1 & 2 are correct; 3 is wrong
- B1 & 3 are correct; 2 is wrong
- C2 & 3 are correct; 1 is wrong
5When we find a defect in requirements or design, this will cost (...) finding the same defect in production.
- Amore than
- Bless than
- Cthe same as
6If we want to categorize the reviews into two types, they would be:
- Astatic and dynamic review
- Bexperience-based and metrics-based review
- Cformal and informal review
7Which of the following are the correct steps of the review process?
- APlanning, monitoring, analysis, design and executing
- BPlanning, initial review, technical review, checklist based and roles
- CPlanning, initial review, individual review, issue communication and analysis, and fixing and reporting
- DPlanning, initial review, executing, technical review, and fixing and reporting
8Which of the following occurs in the "Planning" step of the review process?
- ADistributing the work product
- BDefining scope & estimating effort
- CNoting potential defects
9What is the difference between Entry & Exit criteria in the review process?
- AEntry criteria are goals that need to be achieved, while exit criteria are prerequisites that must be met in order to be able to begin our review
- BEntry criteria are prerequisites that must be met in order to be able to begin our review, while exit criteria are goals that need to be achieved
10Which of the following occurs in review process step "Initiate review"?
- AEvaluating and documenting quality characteristics
- BGathering metrics (for more formal review types)
- CAnswering any questions that participants may have about the review
11Reviewing all or part of the work product, noting potential defects and questions, those activities occur in which step in the review process?
- AInitiate review
- BIndividual review
- CPlanning
12In which step in the review process does this activity happen "Evaluating the review findings against the exit criteria to make a review decision"?
- AFixing and reporting
- BIssue communication and analysis
- CIndividual review (i.e., individual preparation)
13In which step in the review process does this activity occur "Accepting the work product when the exit criteria are reached"?
- AIssue communication and analysis
- BIndividual review
- CFixing and reporting
14Who is responsible of creating the work product under review?
- AReviewer
- BManager
- CAuthor
- DFacilitator
15If we run a review meeting to review the code developed for a mobile application, who is the author in this review meeting?
- AThe tester
- BThe developer
- CThe product owner
- DThe scrum master
16The person who is responsible for review planning, assigning staff and budget, and monitoring cost-effectiveness is.....
- AThe reviewer
- BThe facilitator
- CThe author
- DThe manager
17Who is responsible of ensuring that the review meeting is run in an effective way?
- AThe reviewer
- BThe facilitator
- CThe manager
- DThe author
18One of the roles in the review is the moderator, we also call him...
- AFacilitator
- BAuthor
- CReviewer
19Who takes the overall responsibility of the review?
- AThe scribe
- BThe author
- CThe moderator
- DThe review leader
20Who is responsible of collating potential defects found during the individual review activity?
- AThe moderator
- BThe scribe
- CThe author
- DThe reviewer
21Which review types aims at quickly solving minor problems?
- APairing
- BWalkthrough
- CTechnical Review
- DInspection
22The informal review is also called "buddy check" because it is performed by...
- Aa college of the facilitator
- Ba college of the author
- Ca college of the review leader
23The main purposes of ….. review type include: improving the software product, considering alternative implementations and finding defects.
- AFormal
- BInformal
- CWalkthrough
- DTechnical
24In the ‘’Walkthrough’’ review type the…. is mandatory and the leader of the review meeting is the...
- AScribe / Author of the work product
- BModerator / Facilitator
- CManager / Reviewer
- DScribe / Moderator
25The purposes of... review type include: detecting potential defects, evaluating quality and building confidence in the work product, preventing future similar defects through author learning and root cause analysis
- AFormal
- BInspection
- CWalkthrough
- DTechnical
26In the ‘’Technical review’’ type, the… are mandatory, and the technical peers of the author are the...
- AIndividual preparation and scribe / reviewers
- BIndividual preparation and author / moderators
- CProduct owner and facilitator / managers
- Dchecklists and scribe / reviewers
27The purposes of ….. review type include: preventing future similar defects through author learning and root cause, and achieving consensus.
- AInformal
- BInspection
- CWalkthrough
- DTechnical
28Which of the following review types should have: a defined process, individual preparation and a scribe, and it might produce defect logs and a review report?
- AWalkthrough review
- BTechnical review
- CInformal review
- DInspection review
29In the Inspection review type, the leader of the review meeting is the...
- AFacilitator
- BAuthor
- CManager
- DReviewer
30Any types of reviews that are done by colleagues at a similar approximate organizational level, can be done as...
- AFormal reviews
- BPeer reviews
- CTechnical reviews
- DInspection reviews
31… is used when we depend mainly on reviewer skills and when we have little or no planning and little preparation.
- AAd hoc technique
- BChecklist-based technique
- CScenario and dry run
- DRole based technique
32... is a systematic technique where we set a group of questions that are distributed at review initiation based on potential defects.
- AAd hoc technique
- BChecklist-based technique
- CScenario and dry runs technique
- DRole based technique
33In..., reviewers are given better structured guidelines on how to read through the work product and to identify specific defects types.
- AAd hoc technique
- BChecklist-based technique
- CScenario and dry runs technique
- DRole based technique
34In... , reviewers evaluate the work product from the perspective of individual stakeholder roles including specific end user types and specific roles in the organization.
- AAd hoc technique
- BChecklist-based technique
- CRole-based technique
- DPerspective-based technique
35…. is a very effective technique to review requirements and technical work products using different stakeholder viewpoints, and it is similar to role-based techniques.
- AAd hoc technique
- BChecklist technique
- CScenario and dry runs
- DPerspective - based technique
Información
- Descripción
- Test sobre Chapter 3 - CTFL ISTQB, creado por America LH el 06/06/2022.
- Autor
- America LH
- Idioma
- English
- Visitas
- 294
- Etiquetas
- Valoración
- Aún sin valoraciones Valora este test