  1. 1Which of the following is a correct definition of a review?
    1. AThe review is mostly a manual activity in which work products like requirements, code, and design are reviewed in order to find defects in them
    2. BThe review is an automated activity in which work products like requirements, code, and design are reviewed in order to find defects in them
    3. CThe review is an automated activity in which the code is reviewed in order to find warnings and errors in it
  2. 2Which of the following is correct?
    1. AReviews rely on the manual examination of work products while static analysis is tool-driven
    2. BStatic analysis relies on the manual examination of work products while reviews are tool-driven
    3. CBoth reviews and static analysis are tool-driven
  3. 3What is the difference between warning and errors in the code?
    1. ACode can run without solving errors, but it can't run without solving warnings
    2. BCode can run without solving warnings, but it can't run without solving errors
    3. CAll warnings and errors must be solved before running the code
  4. 4Which of the following is correct regarding static analysis?

    1-Static analysis is an important part of security testing
    2-Static analysis is used only in sequential lifecycle models
    3-Static analysis is important for safety-critical computer systems
    1. A1 & 2 are correct; 3 is wrong
    2. B1 & 3 are correct; 2 is wrong
    3. C2 & 3 are correct; 1 is wrong
  5. 5When we find a defect in requirements or design, this will cost (...) finding the same defect in production.
    1. Amore than
    2. Bless than
    3. Cthe same as
  6. 6If we want to categorize the reviews into two types, they would be:
    1. Astatic and dynamic review
    2. Bexperience-based and metrics-based review
    3. Cformal and informal review
  7. 7Which of the following are the correct steps of the review process?
    1. APlanning, monitoring, analysis, design and executing
    2. BPlanning, initial review, technical review, checklist based and roles
    3. CPlanning, initial review, individual review, issue communication and analysis, and fixing and reporting
    4. DPlanning, initial review, executing, technical review, and fixing and reporting
  8. 8Which of the following occurs in the "Planning" step of the review process?
    1. ADistributing the work product
    2. BDefining scope & estimating effort
    3. CNoting potential defects
  9. 9What is the difference between Entry & Exit criteria in the review process?
    1. AEntry criteria are goals that need to be achieved, while exit criteria are prerequisites that must be met in order to be able to begin our review
    2. BEntry criteria are prerequisites that must be met in order to be able to begin our review, while exit criteria are goals that need to be achieved
  10. 10Which of the following occurs in review process step "Initiate review"?
    1. AEvaluating and documenting quality characteristics
    2. BGathering metrics (for more formal review types)
    3. CAnswering any questions that participants may have about the review

Información

Descripción
Test sobre Chapter 3 - CTFL ISTQB, creado por America LH el 06/06/2022.
Idioma
English
Visitas
294
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?