  1. 1What are the 8 different stages of The Systems Life Cycle?1. Feasibility
    2. Analysis
    3. Design
    4. Implementation
    5. Testing
    6. Installation
    7. Documentation
    8. Evaluation & Maintenance
  2. 2What is the purpose of the feasibility stage?It is to fully understand the problem and to work out if it is worth fixing.
  3. 3What are the 5 main factors that need to be considered?Technical Feasibility
    Economic Feasibility
    Legal Feasibility
    Operational Feasibility
    Schedule Feasibility
  4. 4What is technical feasibility?Involves looking at whether the technology exists to implement the proposed system. Or whether this is a practical proposition.
  5. 5What is Economical Feasibility?Involves establishing the cost effectiveness of the proposed system. If the benfits do not out weigh the cost then the project is not worth going ahead.
  6. 6What is legal feasibility?Involved checking to see if the proposed system faults within legal guidelines.
  7. 7What is operational feasibility?Involves the current work practices and procedures are adequate to support the new system.

Información

Descripción
Fichas sobre The Systems Life Cycle, creado por 2008mullenf el 20/01/2015.
Creado por
2008mullenf
Visitas
1
Valoración

Más sobre Feasibility Study

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?