Fichas
The Systems Life Cycle
Fichas del conjunto (7)
- 1What are the 8 different stages of The Systems Life Cycle?1. Feasibility
2. Analysis
3. Design
4. Implementation
5. Testing
6. Installation
7. Documentation
8. Evaluation & Maintenance - 2What is the purpose of the feasibility stage?It is to fully understand the problem and to work out if it is worth fixing.
- 3What are the 5 main factors that need to be considered?Technical Feasibility
Economic Feasibility
Legal Feasibility
Operational Feasibility
Schedule Feasibility - 4What is technical feasibility?Involves looking at whether the technology exists to implement the proposed system. Or whether this is a practical proposition.
- 5What is Economical Feasibility?Involves establishing the cost effectiveness of the proposed system. If the benfits do not out weigh the cost then the project is not worth going ahead.
- 6What is legal feasibility?Involved checking to see if the proposed system faults within legal guidelines.
- 7What is operational feasibility?Involves the current work practices and procedures are adequate to support the new system.
Información
- Descripción
- Fichas sobre The Systems Life Cycle, creado por 2008mullenf el 20/01/2015.
- Creado por
- 2008mullenf
- Visitas
- 1
- Valoración