¡GoConqr estrena diseño! Cuéntanos qué te parece.

Fichas

Facilities CH.1: GENERALITIES

Jose Velasco Nieto Facilities Español 1 ficha

Fichas del conjunto (1)

  1. 1*Tripple Bottom Line (TBL) aim to measure the financial,social and enviromental performance of the coorporation over a period of time -Linear pattern: Nature>Industry>Waste -Success with: +People: all individuals are threated fairly (EQUITY) +Planet: no impact in natural resources (ECOLOGY) +Profit: Economic success not limited by pursuit of the other two values (ECONOMY) *Building Management System (BMS) is an engineering system that let us control,programm or manage the rest of the engineering system of the hotel cost 20% of budget and save up 30% -Components: +BUS: central wire that where all the info. travels around the hotel +Wires: cables connected to the central wire BUS +Dectectors/Sensors: detect info./receive info. +Activators: switches or alarms +Control Center: detects and sends message to the activators -BMS helps to develop the Enviromental Management Plan (EMP) -Functions +control internal conditions +central and remote control +save time and money*Types of Maintenance
    -Time Based
    preventive type of maintenance based on scheduled plan by periodically revision of equipment of the property
    allows prevent complaints of items
    -Run to Failure
    wait for things to happen until something is broken or failed
    could increase costs
    -Condition Based
    using sensors and computers to monitor the equipment
    -Reliability Centered
    Environmental management program that sets goal whenever we do the maintenance
    incorporates the last three categories and uses the most apropriate of them
    works with the BMS
    focused on Reliability
    *Tools of communication
    4 tools used by the chief engineering to carry the department responsabilities
    1. Blue Prints ( Technical drawings)
    -Hotel floor plan: image of the top horizontally cut
    -Elevation plan: image from outside
    -Section plan: image of vertically sections
    Technical plan: represents technical info.
    Perspective plan: 3D image
    2.Budget
    integral part of the planning process
    amount of money needed for a year

Información

Descripción
(CH.1 GENERALITIES) Facilities Fichas sobre Facilities CH.1: GENERALITIES, creado por Jose Velasco Nieto el 12/02/2019.
Visitas
0
Valoración

Más sobre Hotel Facilities, Maintenance and Safety

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?