¡GoConqr estrena diseño! Cuéntanos qué te parece.

Fichas

BUS 371 - Chapter 3 Terms

Ms. Cassie Weitzenkamp, CPA, MPA BUS 371 . Inglés 23 fichas

Fichas del conjunto (23)

  1. 1Applied OverheadThe dollar amount of overhead assigned to Work in Process inventory using the activity measure that was selected to develop the overhead rate
  2. 2Under-applied overheadOccurs when the overhead applied to Work in Process inventory is less than the actual overhead cost
  3. 3Over-applied overheadOccurs when the overhead applied to Work in Process inventory is more than actual overhead cost
  4. 4Theoretical CapacityThe estimated maximum potential activity for a specified time
  5. 5Practical CapacityReducing theoretical capacity by ongoing, regular operating interruptions (such as holidays, downtime, and start-up time)
  6. 6Normal CapacityConsideration of historical and estimated future production levels and the cyclical fluctuations
  7. 7Expected CapacityA short-run concept that represents the firm's anticipated activity level for the coming period based on projected product demand
  8. 8High-low MethodAnalyzes a mixed cost by first selecting the highest and lowest levels of activity in a data set if these two points are within the relevant range
  9. 9OutliersNon-representative or abnormal observations
  10. 10Flexible budgetA planning document that presents expected variable and fixed costs at different activity levels
  11. 11Absorption Costing/ Full CostingTreats the costs of all manufacturing components (direct material, direct labor, variable overhead, and fixed overhead) as inventoriable, or product, costs in accordance with GAAP
  12. 12Functional ClassificationA group of costs that were incurred for the same principal purpose
  13. 13Variable Costing/ Direct CostingA cost accumulation method that includes only direct material, direct labor, and variable overhead as product costs
  14. 14Product Contribution MarginSales minus variable cost of goods sold
  15. 15Contribution MarginThe difference between total revenues and total variable expenses
  16. 16Volume VarianceReflects the monetary impact of a difference between the budgeted capacity used to determine the predetermined fixed overhead rate and the actual capacity at which the company opperated
  17. 17Phantom ProfitsTemporary absorption costing profits caused by producing more inventory than is sold
  18. 18Least Squares Regression AnalysisA statistical technique that analyzes the relationship between independent (causal) and dependent (effect) variables
  19. 19Dependent VariableUnknown variable
  20. 20Independent VariableKnown value
  21. 21Simple RegressionUses one independent variable to predict the dependent variable based on the formula for a straight line: y = a + bX
  22. 22Multiple RegressionTwo or more independent variables are used to predict the dependent variable
  23. 23Regression LineAny line that goes through the means (or averages) of the independent and dependent variables in a set of observations

Información

Descripción
BUS 371 - Chapter 3 Terms
Visitas
78
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?