Mapa mental
Practice Standard for Work Breakdown Structures

Contenido del mapa
Practice Standard for Work Breakdown Structures
1) Introduction to the Practice Standard for Work Breakdown Structures
- Overview
- Successful project management relies on thorough planning.
- This begins by defining the project objectives with sufficiently detailed information
- Concepts
- The WBS define the project’s life cycle as well as the deliverables appropriate to the project, program, or portfolio.
- A key input to other project management processes and deliverables.
- Objectives
- Provides a common ground for understanding the concepts and benefits of the WBS
- Present a standard application of the WBS as a project management tool.
- Overview
2) Defining the WBS
- Overview
- The WBS represents a clear description of the project’s deliverables and scope.
- The WBS subdivides the project work into smaller, more manageable pieces of work.
- Common Usage of Terms
- Work
- Sustained physical or mental effort
- Breakdown
- Division into parts or categories; separation into simpler substances; decomposition.
- Structure
- Something arranged in a definite pattern of organization.
- Deliverable
- Oriented
- Focused toward the concerns and interests of a specific group
- Hierarchical
- Classified according to various criteria into successive levels or layers.
- Decomposition
- Definition of Terms
- Activity
- Apportioned Effort
- Control Account
- Discrete Effort.
- Level of Effort
- Task
- Work Breakdown Structure Component.
- Work Package
- WBS Element.
- Work
- Concepts
- Overview
- The WBS provides a clear vision of the work of the project.
- Deliverables
- Any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project.
- Deign
- It provides a graphical representation or textual outline of the project scope
- Management
- Providing a framework for specifying performance objectives
- Supporting the planning and assignment of responsibilities
- The 100% Rule
- The sum of the work at the ‘‘child’’ level must equal 100% of the work represented by the ‘‘parent’’
- Overview
- Overview
3) Importance of the WBS
- Overview
- The WBS provides the baseline for subsequent change control
- Project failures, however, can often be traced back to a poorly developed or nonexistent WBS.
- Relationship to Other Tools
- There are many project management tools that use the WBS as input :
- Project Charter
- Project Scope Statement.
- Program and Portfolio WBS
- RBS
- OBS
- WBS Dictionary:
- Project Schedule Network Diagram
- Project Schedule
- There are many project management tools that use the WBS as input :
- Overview
4) Defining WBS Quality
- Overview
- To state that a particular WBS is of high quality, one must agree that the WBS has been created so that it satisfies the purpose for which it was created
- WBS Quality Principle 1
- Sub-Principle 1—Core Characteristics
- These characteristics represent the minimum set of specific attributes a WBS must contain
- Sub-Principle 2—Use-Related Characteristics
- These characteristics enable the WBS to be used for purposes that are unique to a specific project, industry or environment
- Sub-Principle 1—Core Characteristics
- WBS Quality Principle 2
- There is no conceptual difference between a project WBS, a program WBS, and a portfolio WBS.
- Problem Diagnostic Checklist
- The project scope has changed and is unmanageable
- Has a WBS been created for the project?
- Individuals are unable to use the new product or feature
- Are the WBS elements deliverable-focused?
- The project scope has changed and is unmanageable
- Overview
Imágenes y archivos del mapa
Información
- Descripción
- Mapa Mental sobre Practice Standard for Work Breakdown Structures, creado por jonathan villalba huaman el 15/04/2018.
- Creado por
- jonathan villalba huaman
- Visitas
- 0
- Valoración
Más sobre Project Scope Management