Soft Engineering

  1. Afforestation

    • +Increased interception storage
    • +reduces runoff
    • +Holds soil together(improves quality) to reduce silting up the channel
    • +Cheap
    • -Time consuming
    • -Soil disturbance during planting causes more run off initially
    • -Trees take a long time to mature (delayed advantages)
  2. Contour Ploughing

    • +Reduces run off
    • +Reduces soil loss
    • -Relatively small impact
    • -Less effective during heavy rainfall
    • -Reguarly has to be replowed
  3. Flood Proofing

    • flood proof buildings, alter existing ones, important buildings on high land, temporary flood gates
      • -Expensive to alter existing buildings
      • -time consuming
      • -Doesn't guarantee safety( could lull people into false sense of security)
      • + Reduces harm done/costs of flooding
  4. Floodplain zoning

    • uses historical records to identify most vulnerable areas
      • +impact reduced
      • +risk of flooding reduced(no impermeable surfaces built)
      • -cant re site existing buildings
      • -The expansion of urban areas is limited
  5. Flood Prediction/Warning

    • + Allows for action to be taken prior to flood
    • +Reduce likelihood of damage/injuries
    • +Cheap
    • -Doesn't prevent flooding or most damage
    • -inacurate predictions
    • -Can increase insurance costs in high risk areas
  6. Naturalisation

    • Restoration of rivers closer too original course (removal of hard engineering)
      • -Expensive
      • -Can still lead to large floods often affecting farmland or commercial developments
      • -Is long term gain adequate compensation for people affected by this?
      • +Allows land to flood naturally and soak up excess water reducing flashy nature of floods
      • +Bank edge planting and willows are cheaper alternative than metal concrete to support erosion prone bans
  7. Wetlands

    • Areas deliberately allowed to flood
      • +other valuable areas are safe
      • +Natural:wildlife can thrive
      • -Doesn't prevent flooding

Información

Descripción
a level Geography Mapa Mental sobre Soft Engineering, creado por jessica.simms el 23/02/2015.
Creado por
jessica.simms
Visitas
3
Valoración

Más sobre Flood Defence and Engineering Strategies

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?