¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

Engineering 2

Jimmy Snell Inglés

Engineering 2

Contenido del mapa

Engineering 2

  1. Scales of production

    • One-off
      • Where just one product is made for a customer. Could be a prototype
        • Examples
          • Personalised products.
    • Batch
      • A set number of identical products. Some flexibility to individualise designs.
        • Examples
          • Monthly magazine, furniture, electrical goods, clothing.
    • Mass
      • Products produced in large quantities. Often involves automation.
        • Examples
          • Food, cars.
    • Continuous
      • Automated production can continue for months. Often produces low-cost products.
        • Examples
          • Toilet roll, petrol, washing-up liquids, washing powder, bricks, food.
  2. Reducing waste (4 R's)

    • Reduce
      • Engineers should think about using less materials and energy to manufacture products.
    • Reuse
      • If a product can be used again, this reduces the amount of materials going to landfill.
    • Recover
      • Waste materials can be treated to generate heat or power for other uses.
    • Recycle
      • Products can be broken down into materials that can then be re-manufactured to make new items.
  3. Modern materials and processes

    • Metal foams
      • Metal foams are cellular structures made with metal rather than polymers.
        • They are often used as soundproofing in vehicles, or as crash protection.
          • In electronics they can be used as heat sinks.
    • Powder metallurgy
      • A fine metal powder is compacted into the shape required, then heated in a controlled way to bond the particles together.
        • Powder metallurgy is used to make complex designs.
  4. Lean manufacturing

    • Just-in-time
      • Materials and components are delivered to a production line when they are needed, thus reducing cost and time. Many well-planned manufacturing systems are based on just-in-time.
    • Kaizan
      • To make things better, a company needs to improve continuously. Kaizan is a system where ideas that are suggested by workers that can be used to make production better.
    • Poka-yoke
      • Mistakes often happen in engineering. Poka-yoke is a method that can be used to eliminate human error where tasks are repeated. The benefit to staff is that jobs become less boring.

Imágenes y archivos del mapa

  • Engineering 2
  • Engineering 2
  • Engineering 2
  • Engineering 2
  • Engineering 2
  • Engineering 2

Información

Descripción
Mapa Mental sobre Engineering 2, creado por Jimmy Snell el 27/04/2015.
Creado por
Jimmy Snell
Visitas
1
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?