¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

untitled

usman ahmed Inglés

Contenido del mapa

untitled

  1. retaining walls

    • type depends on force to withstand + appropriateness.
    • Sheared ground > 1.2m deep to be retained
  2. Surveying

    • resection = 'free' surveying so long as at least 2 targets visible. more for greater accuracy
  3. BCC specs as well as clients/ utilties to be considered.

  4. Types of contract(See contracts DOC)

    • NEC3 contract
      • NCR(non conformance report)
        • consultant/(The Engineer) assesses construction site, sends NCR if any deficiency
      • Acceleration = project CAN be completed faster but needs to be agreed on how to with client
    • JCT(Joint contracts tribunal)
    • ICE conditions contract
  5. RAMS(Risk assessment + method statement)

    • RAMS given from sub. to main->reviewed-> sent back if inadequate.
    • template useful to ensure consistency between sub. and contractor- MUST be explicit and specific to task
    • must consider all stakeholders
  6. Permits

    • hots works/confined spaces/disturb ground

Información

Descripción
Mapa Mental sobre untitled, creado por usman ahmed el 24/07/2015.
Creado por
usman ahmed
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?